COMPANY RECORD · BOULDER, CO

Control Service Center Inc — permit history in Boulder, CO

Control Service Center Inc appears on 102 Boulder permit records from 2015 through 2026, all of them mechanical / hvac.

Permit categories

CategoryPermitsShare
Mechanical / HVAC102100%

Activity by year

YearPermits issued
201534
201617
201727
20188
20192
20212
20242
20257
20263

Busiest year on record: 2015, with 34 permits. One project can account for several filings, so read this as filing activity rather than workload.

Where they worked

Address in sourceMost recent permit
2525 ARAPAHOE AVE2026-07-10
1360 WALNUT ST 1102026-05-20
1470 WALNUT ST2026-03-20
1942 BROADWAY2025-10-22
1738 PEARL ST2025-10-22
1880 55TH ST2025-07-02
1301 CANYON BLVD 1002025-04-21
6200 LOOKOUT RD2025-03-25
5340 AIRPORT BLVD2025-02-12
1685 38TH ST2025-01-15
63 S CHERRYVALE RD2024-12-03
5330 AIRPORT BLVD2024-11-20
2323 55TH ST2021-11-05
5400 AIRPORT BLVD2021-11-03

83 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $500 to $650,828, median $24,998. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

102 permits; open the 50 most recent
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
MEC2026-011162026-07-10Mechanical / HVAC2525 ARAPAHOE AVE**McGuckin Hardware* Replace RTU with like for like. No electrical modification required. **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new plastic g$29,638
MEC2026-003862026-05-20Mechanical / HVAC1360 WALNUT ST 110Replace Makeup Air Unit with Like-for-like replacement **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new plastic glued vents for fuel burning applian$46,792
MEC2026-003992026-03-20Mechanical / HVAC1470 WALNUT STReplace boiler. **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new plastic glued vents for fuel burning appliances must undergo pressure testing. To f$124,320
MEC2025-015732025-10-22Mechanical / HVAC1942 BROADWAYReplace existing boiler with (2) new 97% efficiency condensing boilers **All new plastic glued vents for fuel burning appliances must undergo pressure testing. To facilitate the i$96,515
MEC2025-017462025-10-22Mechanical / HVAC1738 PEARL ST*Voided for inactivity - no inspections for 180 days* Replace existing RTU 15 with like-for-like 5 Ton 13.4 SEER2, 130k BTU 81% AFUE **All new plastic glued vents for fuel burnin$22,867
MEC2025-010192025-07-02Mechanical / HVAC1880 55TH STReplace (2) packaged RTUs with like-for-like units$77,059
MEC2025-004542025-04-21Mechanical / HVAC1301 CANYON BLVD 100Replace rooftop chiller with like for like unit.$650,828
MEC2025-003332025-03-25Mechanical / HVAC6200 LOOKOUT RDReplace (5) total makeup air units with like-for-like units.$434,804
MEC2024-015732025-02-12Mechanical / HVAC5340 AIRPORT BLVDFurnish and install one new split system heat pump AC **Reference ELE2025-00039**$64,216
MEC2025-000772025-01-15Mechanical / HVAC1685 38TH STReplace RTU 36 with one new like-for-like 15 ton unit.$34,253
MEC2024-016472024-12-03Mechanical / HVAC63 S CHERRYVALE RDReplace furnace and AC with new heat pump units per plans. In conjunction with Permit ELE2024-00910$61,386
MEC2024-015742024-11-20Mechanical / HVAC5330 AIRPORT BLVDReplace existing split system AC unit with new heat pump AC$53,417
MEC2021-021662021-11-05Mechanical / HVAC2323 55TH STReplace (5) like for like RTUs (2) - 15 ton (1) - 10 ton (1) - 8.5 ton (1) - 3 ton$94,617
MEC2021-018372021-11-03Mechanical / HVAC5400 AIRPORT BLVD*Voided for inactivity - requirements not met.* Replace (3) packaged RTUs with like for like units.$75,081
MEC2019-019662019-12-02Mechanical / HVAC1926 PINE ST*Voided for inactivity - no inspections within 180 days* *Replace furnace, AC and water heater$2,753
MEC2019-012162019-07-31Mechanical / HVAC1434 SPRUCE ST*Voided for inactivity due to no inspections performed within 180 days of issuance.*Installation of (3) replacement RTUs. (1) 102k Btu/h, 12.2 EER, 81% efficient, single-package, $48,147
MEC2018-002152018-09-26Mechanical / HVAC4909 NAUTILUS CT NInstallation of (9) replacement RTUs. (6) 150k Btu/h, 12.2 EER, 81% efficient, single-package, heating and cooling unit. (1) 180k Btu/h, 12.0 EER, 81% efficient, single-packag$122,808
MEC2018-003022018-08-20Mechanical / HVAC1011 WALNUT STSuite 400, Vision Ridge - Demolition of existing unit and removal of non-structural walls. Remodel to create eleven offices, two conference room and a break room, update of existin$40,000
MEC2018-002182018-07-11Mechanical / HVAC5400 SPINE RDInstallation of a replacement RTU, 90k Btu/h, 11.1 EER, 81% efficient, single-package, heating and cooling unit, like for like in same location. Installation per manufacturer's spe$10,626
MEC2018-000352018-06-21Mechanical / HVAC4845 PEARL EAST CIR Interior tenant remodel of an office suite for Pearson Knowledge Technologies. Scope includes construction of new reception, conference, focus and team rooms, open office, copy, p$27,500
MEC2018-002192018-05-23Mechanical / HVAC2323 55TH STInstallation of a replacement RTU, 72k Btu/h, 12 EER, 81% efficient, single-package, heating and cooling unit, like for like in same location. Installation per manufacturer's speci$10,856
MEC2018-002202018-05-22Mechanical / HVAC637 S BROADWAYInstallation of (2) replacement RTU's, 60k Btu/h, 15 SEER, 81% efficient, single-package, heating and cooling units, like for like in same location. Installation per manufacturer's$12,275
MEC2018-002132018-05-03Mechanical / HVAC1700 38TH STInstallation of (4) replacement RTUs. (1) 180k Btu/h, 12 EER, 80% efficient, single-package, heating and cooling unit. (2) 120k Btu/h, 12.2 EER, 81% efficient, single-package,$64,753
MEC2018-002062018-05-02Mechanical / HVAC1743 WALNUT STInstallation of (2) replacement RTU?s on an existing commercial building, 90k Btu/h, 12.2 EER, 81% efficient, single-package, heating and cooling unit, like for like in same locati$27,959
PMT2017-05405-MEC2017-12-19Mechanical / HVAC685 NORTHSTAR CTInstallation of a replacement 80k BTU, 82% efficient forced air furnace. Installation of a replacement 16 SEER, 3.0 ton A/C system. Installation per manufacturer's specifications$6,697
PMT2017-03046-MEC2017-11-02Mechanical / HVAC2560 55TH STInstallation of (11) replacement RTU's and (1) split-system, like for like in same location. (5) 12 EER, 12.5 ton RTU's (6 ) 12 EER, 10 ton RTU (1) 14 SEER, 5 $168,868
PMT2017-03039-MEC2017-11-02Mechanical / HVAC4750 WALNUT STInstallation of (9) replacement RTU's, like for like in same location. (2) 12 EER, 20 ton RTU (5) 12 EER, 15 ton RTU's (2) 12 EER, 12.5 ton RTU's $179,886
PMT2017-03048-MEC2017-11-02Mechanical / HVAC2500 55TH STInstallation of (8) replacement RTU's, like for like in same location. (6) 12 EER, 15 ton RTU's (2) 12 EER, 12.5 ton RTU's Installation per manufacturer's spec$145,251
PMT2017-03047-MEC2017-11-02Mechanical / HVAC2520 55TH STInstallation of (10) replacement RTU's, like for like in same location. (1) 17 EER, 3.0 ton RTU (1) 12 EER, 7.5 ton RTU (2) 12 EER, 12.5 ton RTU's (6) $135,593
PMT2017-03095-MEC2017-11-02Mechanical / HVAC4888 PEARL EAST CRInstallation of (1) replacement, 17.2 SEER, 5 ton RTU, like for like in same location. Installation per manufacturer's specifications. No structural work proposed or approved withi$9,168
PMT2017-03045-MEC2017-11-02Mechanical / HVAC2580 55TH STInstallation of (10) replacement RTU's, like for like in same location. (7) 12 EER, 15 ton RTU's (3) 12 EER, 12.5 ton RTU's Installation per manufacturer's speci$181,494
PMT2017-03037-MEC2017-11-02Mechanical / HVAC4760 WALNUT STInstallation of (2) replacement, 17.1 SEER, 3.0 ton RTU's, like for like in same loction. Installation per manufacturer's specifications. No structural work proposed or approved wi$17,212
PMT2017-03038-MEC2017-11-02Mechanical / HVAC4740 WALNUT STInstallation of (6) replacement RTU's, like for like in same location. (1) 12 EER, 20 ton (3) 12 EER, 17.5 ton (2) 12 EER,15 ton Installation per manufacturer's specifications$118,587
PMT2017-03092-MEC2017-11-02Mechanical / HVAC4949 PEARL EAST CRInstallation of (1) replacement, 12 EER, 20 ton RTU, like for like in same location. Installation per manufacturer's specifications. No structural work proposed or approved within $24,452
PMT2017-04026-MEC2017-10-12Mechanical / HVAC2665 MAPLETON AVUnits A, B, C, D, E, F, G, H, and I: Replacement water heaters (38 gal, 0.59 UEF) and furnaces (60,000 BTU, 80% AFUE) in all units.$24,291
PMT2017-04025-MEC2017-10-11Mechanical / HVAC2671 MAPLETON AVUnits A, B, C, D, E, and F: Replacement water heaters (38 gal, 0.59 UEF) and furnaces (60,000 BTU, 80% AFUE) in all units.$16,194
PMT2017-04082-MEC2017-10-10Mechanical / HVAC637 S BROADWAYH - Installation of a replacement RTU, 60k Btu/h, 14 SEER, 85% efficient, single-package, heating and cooling unit, like for like in same location. Installation per manufacturer's $9,599
PMT2017-04017-MEC2017-10-10Mechanical / HVAC2683 MAPLETON AVUnits A, B, C, D, E, F, G, H, I, and J: Replacement water heaters (38 gal, 0.59 UEF) and furnaces (60,000 BTU, 80% AFUE) in all units.$26,990
PMT2017-04015-MEC2017-10-10Mechanical / HVAC2663 MAPLETON AVUnits A, B, C, D, E, F, G, H, I, and J: Replacement water heaters (38 gal, 0.59 UEF) and furnaces (60,000 BTU, 80% AFUE) in all units.$26,990
PMT2017-04083-MEC2017-10-10Mechanical / HVAC637 S BROADWAYG - Installation of a replacement RTU, 60k Btu/h, 14 SEER, 85% efficient, single-package, heating and cooling unit, like for like in same location. Installation per manufacturer's $11,978
PMT2017-04084-MEC2017-10-10Mechanical / HVAC2835 PEARL ST*Voided for inactivity due to no inspections performed within 180 days of issuance.* Installation of a replacement RTU, 180k Btu/h, 11 EER, 81% efficient, single-package, heating $18,523
PMT2017-04087-MEC2017-10-10Mechanical / HVAC2675 MAPLETON AVInstallation of a replacement 75.1K BTU, 80% efficient, gas storage water heater for the Boulder Head Start School. Install thermal expansion device, service outlet and carbon mono$2,699
PMT2017-04088-MEC2017-10-10Mechanical / HVAC2685 MAPLETON AVInstallation of a replacement 75.1K BTU, 80% efficient, gas storage water heater for the Community Center. Install thermal expansion device, service outlet and carbon monoxide dete$2,699
PMT2017-04080-MEC2017-10-10Mechanical / HVAC3000 CENTER GREEN DRInstallation of a replacement RTU, 72k Btu/h, 12 EER, 85% efficient, single-package, heating and cooling unit, like for like in same location. Installation per manufacturer's speci$9,598
PMT2017-04085-MEC2017-10-10Mechanical / HVAC4909 NAUTILUS CTInstallation of a replacement RTU, 150k Btu/h, 12.2 EER, 81% efficient, single-package, heating and cooling unit, like for like in same location. Installation per manufacturer's sp$17,584
PMT2017-03091-MEC2017-07-28Mechanical / HVAC4909 NAUTILUS CTInstallation of (3) replacement RTU's, like for like in same location. (1) 12 EER, 12.5 ton RTU, 165 MBH [RTU 10] (1) 12 EER, 12.5 ton RTU, 165 MBH [R$49,625
PMT2017-03090-MEC2017-07-27Mechanical / HVAC4710 TABLE MESA DRInstallation of (4) replacement RTU's, like for like in same location. (1) 11.2 EER, 3 ton RTU (1) 11.2 EER, 6 ton RTU (1) 11.2 EER, 7.5 ton RTU (1) 1$37,996
PMT2017-03036-MEC2017-07-27Mechanical / HVAC4772 WALNUT STInstallation of (10) replacement RTU's, like for like in same location. (1) 12 EER, 20 ton RTU (1) 12 EER, 17.5 ton RTU (4) 12 EER, 15 ton RTU's (2) $174,829
PMT2017-03049-MEC2017-07-27Mechanical / HVAC4775 WALNUT STInstallation of (1) replacement RTU, 11.8 EER, 7.5 ton, like for like in same location. Installation per manufacturer's specifications. No structural work proposed or approved with$14,136
PMT2017-01109-MEC2017-03-22Mechanical / HVAC685 S BROADWAY"Like for like" replacement of two RTU's (11.5 MBH, 4 ton) for animal clinic.$18,923

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public Boulder permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →