COMPANY RECORD · BOULDER, CO

City Electric, Inc — permit history in Boulder, CO

City Electric, Inc appears on 97 Boulder permit records from 2015 through 2026, most often electrical (99% of the record).

Permit categories

CategoryPermitsShare
Electrical9699%
General construction11%

2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.

Activity by year

YearPermits issued
20158
201613
201751
20184
20192
20203
20212
20227
20233
20241
20251
20262

Busiest year on record: 2017, with 51 permits. One project can account for several filings, so read this as filing activity rather than workload.

Where they worked

Address in sourceMost recent permit
850 INCA PKWY2026-08-19
230 CIMMARON WAY2026-05-20
2340 WALNUT ST2025-09-18
3145 BELL DR2024-04-05
3751 DAVIDSON PL2023-11-29
560 S 43RD ST2023-04-19
2700 WINDING TRAIL DR2023-03-02
777 POPLAR AVE 7552022-12-09
2835 DOVER DR2022-11-01
1560 REDWOOD AVE2022-10-18
3009 MADISON AVE 305I2022-09-02
2707 VALMONT RD 207B2022-07-26
10 S 33RD ST2022-05-18
2110 BASELINE RD2022-03-29

96 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $20,000, median $500. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

97 permits; open the 50 most recent
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
ELE2026-008762026-08-19Electrical850 INCA PKWYRemove existing 100a service and replace with a 200a service, update grounding and add a whole-home surge suppressor.$5,364
ELE2026-005182026-05-20Electrical230 CIMMARON WAYService upgrade to replace the existing 100a service with a 200a, replace meter, panel and breakers, update grounding, add whole home Surge protector$7,479
ELE2025-008262025-09-18Electrical2340 WALNUT STService change to address existing Federal Pacific electrical panels, remove and replace existing 600a service with a new 600a service, (no upgrade) remove and replace (5) tenant $16,438
ELE2024-002912024-04-05Electrical3145 BELL DRReplace existing Federal Pacific electrical panel as needed to include new 200a panel, AFCI circuit breakers, grounding and surge suppressor.$3,142
ELE2023-012542023-11-29Electrical3751 DAVIDSON PLService change as needed to address Federal Pacific panel and Utility meter that is located indoors. Relocate meter/panel to exterior, update grounding, install whole-house surge $6,384
ELE2023-003992023-04-19Electrical560 S 43RD ST*Voided for inactivity - no inspections within 180 days* Service change as needed to replace existing panel without proper clearances. Install new meter, exterior disconnect, p$3,981
ELE2023-001792023-03-02Electrical2700 WINDING TRAIL DRSupply and install a new 200A exterior panel/disconnect, update grounding, install surge suppressor, re-secure loose meter housing to wall (Existing 200a meter and subpanels to re$3,427
ELE2022-015822022-12-09Electrical777 POPLAR AVE 755*Voided for inactivity - no inspections within 180 days* Install (12) new LED recessed cans, replace existing outlets and switches, install new hardwired w/ battery backup Smoke a$3,978
ELE2022-014532022-11-01Electrical2835 DOVER DRRemove and replace existing FPE panel with a new 200a meter and panel. Update grounding, circuit breakers, etc.$4,371
ELE2022-014032022-10-18Electrical1560 REDWOOD AVEVOID- 180 days no activity 200a service upgrade as needed for basement remodel. Replace meter, panel, update grounding$4,125
ELE2022-012342022-09-02Electrical3009 MADISON AVE 305IReplace existing electrical 100a panel with new 100a panel and breakers as requested by buyer of property. No upgrade or other changes needed.$1,625
ELE2022-009882022-07-26Electrical2707 VALMONT RD 207BReplace electrical panel with same size electrical panel as requested by buyer.$1,300
ELE2022-007672022-05-18Electrical10 S 33RD STService change to address undersized panel and unsafe wiring.$3,185
ELE2022-004472022-03-29Electrical2110 BASELINE RD200a Service upgrade$3,475
ELE2021-013042021-08-17Electrical1981 EVERGREEN AVERemove and replace existing PV Solar array as needed for roof replacement. See RFG2021-00395.$2,386
ELE2021-009872021-07-21Electrical903 MEADOW GLEN DRLevel 2 Alteration Including: Kitchen Remodel ~ 225 sqft Ground Floor Powder Room Upgrade ~50sqft Master Bed Closet Removal and New Interior Wall Framing~10 sqft Master Bath Remode$6,285
ELE2020-012802020-09-14Electrical737 PEARL ST*Replace faulty Federal Pacific 100A main breaker enclosure (exterior) with a new 100A main breaker enclosure. No interior work, upgrades or increase in service size, repair only.$785
ELE2020-010762020-07-31Electrical3693 CHASE CTVoided for inactivity - no inspections within 180 days* *Install a new 200A meter/panel combo to include updated grounding.$2,764
ELE2020-006152020-05-11Electrical45 35TH ST*Replace exterior panel, meter and mast with a new 200A combination unit. Existing interior panel will be re-fed. Update grounding as needed.$2,345
ELE2019-015142019-10-04Electrical1031 14TH STElectrical scope to address ENF2019-01019. Scope includes electrical to replace faulty breaker, smoke alarm wiring. Interior scope only (no exterior changes).$112
ELE2019-006832019-06-04Electrical1140 BEREA DRService change to 200 AMPs.$2,650
PMT2018-00960-ELE2018-06-20Electrical3065 STERLING CR*Installation of chiller on roof and fan coils in vegetative room for mechanical, installation of electrical for chiller, fan coils and lighting in veg room, and 2000 amp power upg$20,000
PMT2018-00262-ELE2018-01-22Electrical1111 MAXWELL AV 240Electrical - A/C unit must be identified with unit number. A/C unit must have a means of disconnect within sight of equipment (required on roof next to unit). All wiring must be ra$500
PMT2018-00261-ELE2018-01-22Electrical1111 MAXWELL AV 116Electrical - A/C unit must be identified with unit number. A/C unit must have a means of disconnect within sight of equipment (required on roof next to unit). All wiring must be ra$500
PMT2018-00073-ELE2018-01-08Electrical5197 GALLATIN PLInstallation of a new, flush-mounted, grid-tied, 4.8 kW DC photovoltaic system, utilizing single-phase inverters for rapid shut down, on an existing single-family dwelling. Install$16,275
PMT2017-05592-ELE2017-12-20Electrical1111 MAXWELL AV 101Electrical - A/C unit must be identified with unit number. A/C unit must have a means of disconnect within sight of equipment (required on roof next to unit). All wiring must be ra$500
PMT2017-05593-ELE2017-12-20Electrical1111 MAXWELL AV 224Electrical - A/C unit must be identified with unit number. A/C unit must have a means of disconnect within sight of equipment (required on roof next to unit). All wiring must be ra$500
PMT2017-05261-ELE2017-11-29Electrical844 IRIS AVInstallation of a 4.8 kW grid tied, flush mounted roof PV panels on single-family detached dwelling.$16,800
PMT2017-05051-ELE2017-11-17Electrical1111 MAXWELL AV 102Electrical - A/C unit must be identified with unit number. A/C unit must have a means of disconnect within sight of equipment (required on roof next to unit). All wiring must be ra$500
PMT2017-04891-ELE2017-11-07Electrical1111 MAXWELL AV 124Electrical - A/C unit must be identified with unit number. A/C unit must have a means of disconnect within sight of equipment (required on roof next to unit). All wiring must be ra$500
PMT2017-04769-ELE2017-10-31Electrical1111 MAXWELL AV 241Electrical - A/C unit must be identified with unit number. A/C unit must have a means of disconnect within sight of equipment (required on roof next to unit). All wiring must be ra$500
PMT2017-04527-ELE2017-10-17Electrical1111 MAXWELL AV 108Electrical - A/C unit must be identified with unit number. A/C unit must have a means of disconnect within sight of equipment (required on roof next to unit). All wiring must be ra$500
PMT2017-04528-ELE2017-10-17Electrical1111 MAXWELL AV 210Electrical - A/C unit must be identified with unit number. A/C unit must have a means of disconnect within sight of equipment (required on roof next to unit). All wiring must be ra$500
PMT2017-04534-ELE2017-10-17Electrical1111 MAXWELL AV 117Electrical - A/C unit must be identified with unit number. A/C unit must have a means of disconnect within sight of equipment (required on roof next to unit). All wiring must be ra$500
PMT2017-04502-ELE2017-10-16Electrical1111 MAXWELL AV 211Install disconnect and replace wiring from unit to disconnect, verify breaker size and mark unit. Verify wire size, breaker size and unit is marked. $500
PMT2017-04503-ELE2017-10-16Electrical1111 MAXWELL AV 107Verify wire size, breaker size and unit is marked. install disconnect and replace wiring from unit to disconnect, verify breaker size and mark unit. $500
PMT2017-04504-ELE2017-10-16Electrical1111 MAXWELL AV 222Install disconnect and replace wiring from unit to disconnect, verify breaker size and mark unit. This is in response to CPL2017-00925. $500
PMT2017-04378-ELE2017-10-09Electrical1111 MAXWELL AV 125Electrical - A/C unit must be identified with unit number. A/C unit must have a means of disconnect within sight of equipment (required on roof next to unit). All wiring must be ra$500
PMT2017-04380-ELE2017-10-09Electrical1111 MAXWELL AV 123Electrical - A/C unit must be identified with unit number. A/C unit must have a means of disconnect within sight of equipment (required on roof next to unit). All wiring must be ra$500
PMT2017-04356-ELE2017-10-09Electrical1111 MAXWELL AV 231Electrical - A/C unit must be identified with unit number. A/C unit must have a means of disconnect within sight of equipment (required on roof next to unit). All wiring must be ra$500
PMT2017-04336-ELE2017-10-09Electrical1111 MAXWELL AV 202Electrical - A/C unit must be identified with unit number. A/C unit must have a means of disconnect within sight of equipment (required on roof next to unit). All wiring must be ra$500
PMT2017-04359-ELE2017-10-09Electrical1111 MAXWELL AV 129Electrical - A/C unit must be identified with unit number. A/C unit must have a means of disconnect within sight of equipment (required on roof next to unit). All wiring must be ra$500
PMT2017-04358-ELE2017-10-09Electrical1111 MAXWELL AV 237Electrical - A/C unit must be identified with unit number. A/C unit must have a means of disconnect within sight of equipment (required on roof next to unit). All wiring must be ra$500
PMT2017-04304-ELE2017-10-06Electrical1111 MAXWELL AV 232Electrical - A/C unit must be identified with unit number. A/C unit must have a means of disconnect within sight of equipment (required on roof next to unit). All wiring must be ra$500
PMT2017-04211-ELE2017-10-02Electrical1111 MAXWELL AV 234Electrical - A/C unit must be identified with unit number. A/C unit must have a means of disconnect within sight of equipment (required on roof next to unit). All wiring must be ra$500
PMT2017-04201-ELE2017-09-29Electrical1111 MAXWELL AV 105Electrical - A/C unit must be identified with unit number. A/C unit must have a means of disconnect within sight of equipment (required on roof next to unit). All wiring must be ra$500
PMT2017-04210-ELE2017-09-29Electrical1111 MAXWELL AV 236Electrical - A/C unit must be identified with unit number. A/C unit must have a means of disconnect within sight of equipment (required on roof next to unit). All wiring must be ra$500
PMT2017-04208-ELE2017-09-29Electrical1111 MAXWELL AV 127Electrical - A/C unit must be identified with unit number. A/C unit must have a means of disconnect within sight of equipment (required on roof next to unit). All wiring must be ra$500
PMT2017-04207-ELE2017-09-29Electrical1111 MAXWELL AV 209Electrical - A/C unit must be identified with unit number. A/C unit must have a means of disconnect within sight of equipment (required on roof next to unit). All wiring must be ra$500
PMT2017-04200-ELE2017-09-29Electrical1111 MAXWELL AV 208Electrical - A/C unit must be identified with unit number. A/C unit must have a means of disconnect within sight of equipment (required on roof next to unit). All wiring must be ra$500

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public Boulder permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →