COMPANY RECORD · BOULDER, CO
Anderson Garcia Construction — permit history in Boulder, CO
Anderson Garcia Construction appears on 289 Boulder permit records from 2015 through 2026, most often general construction (39.1% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 113 | 39.1% |
| Electrical | 57 | 19.7% |
| Plumbing | 54 | 18.7% |
| Mechanical / HVAC | 40 | 13.8% |
| Demolition | 25 | 8.7% |
5 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2015 | 64 |
| 2016 | 72 |
| 2017 | 70 |
| 2018 | 22 |
| 2019 | 17 |
| 2020 | 10 |
| 2021 | 10 |
| 2022 | 6 |
| 2023 | 6 |
| 2024 | 2 |
| 2025 | 5 |
| 2026 | 5 |
Busiest year on record: 2016, with 72 permits. One project can account for several filings, so read this as filing activity rather than workload.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 1045 14TH ST | 2026-07-23 |
| 2237 PINE ST | 2026-04-06 |
| 1017 GRANDVIEW AVE | 2026-01-28 |
| 1127 12TH ST | 2026-01-20 |
| 2345 WALNUT ST | 2025-12-12 |
| 2333 WALNUT ST | 2025-08-22 |
| 960 POPLAR AVE | 2025-01-23 |
| 2221 COLUMBINE AVE | 2025-01-17 |
| 624 MAXWELL AVE | 2024-08-29 |
| 385 22ND ST | 2024-05-08 |
| 66 ARAPAHOE AVE | 2023-11-01 |
| 2905 BASELINE RD | 2023-10-30 |
| 905 15TH ST | 2023-10-03 |
| 1020 15TH ST | 2023-06-29 |
90 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $2,943,326, median $3,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
289 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| BLD-MFD2026-00058 | 2026-07-23 | General construction | 1045 14TH ST | Conversion of existing Kitchen to Bedroom, to include enlargement of existing window opening for emergency egress compliance | $4,000 |
| DEM2026-00026 | 2026-04-06 | Demolition | 2237 PINE ST | Deconstruction of detached garage off the alley | $0 |
| ELE2026-00074 | 2026-01-28 | Electrical | 1017 GRANDVIEW AVE | Electrical Temporary Power for a New detached single-family dwelling unit. This is 2nd DU on property. *See BLD-SFD2025-00337* | $0 |
| BLD-SFD2025-00337 | 2026-01-27 | General construction | 1017 GRANDVIEW AVE | New detached single-family dwelling unit. This is 2nd DU on property. | $336,000 |
| BLD-MFD2025-00088 | 2026-01-20 | General construction | 1127 12TH ST | Repair drywall, flooring, and structure affected by fire suppression sprinkler head activation (burst pipe). Repair included replacing light fixtures, switches, plugs and smoke det | $60,000 |
| BLD-SFD2025-00387 | 2025-12-12 | General construction | 2345 WALNUT ST | Alterations of 1st floor (1,015 sf) and addition of stairway and usable space in attic (151 sf). *11/20/25 Revision to reduce scope. Remove the addition of floor area to the exist | $90,000 |
| BLD-SFA2025-00035 | 2025-08-22 | General construction | 2333 WALNUT ST | PROPOSED ALTERATION LEVEL 2 [PER 2018 IEBC] SCOPE TO INCLUDE: · INTERIOR ALTERATIONS AFFECT 320 sf (each unit) · ADD BATHS SO EA. UNIT HAS: (2) 3/4-BATHS & (1) HALF-BATH · MINOR EX | $256,000 |
| BLD-SFD2025-00079 | 2025-05-08 | General construction | 2345 WALNUT ST | Level 3 Alteration of existing rear building to convert a 2-bed 1-bath into a 3-bed 2-bath. Mechanical and appliances upgraded to electric. *8/11/25 Revision to HVAC design from h | $80,000 |
| PLB2025-00009 | 2025-01-23 | Plumbing | 960 POPLAR AVE | Permit only for the replacement of the shower valve and tub filler in master bathroom | $1,750 |
| BLD-SFD2024-00534 | 2025-01-17 | General construction | 2221 COLUMBINE AVE | Interior alterations to floor plan (1,194). New roof structure over rear section to repair fire damage. Minor exterior alterations: new windows and doors (as noted) and patching of | $94,923 |
| ELE2024-00750 | 2024-08-29 | Electrical | 624 MAXWELL AVE | Add 5 hardwired smoke detectors. Add circuits and plugs in kitchen to bring up to code. Replace outlet and switches in entire house. Rewired entire house when accessible. | $4,000 |
| BLD-SFD2024-00034 | 2024-05-08 | General construction | 385 22ND ST | THE PROJECT CONSISTS OF AN INTERIOR REMODEL TO AN EXISTING 1,526 SQUARE FOOT SINGLE FAMILY RESIDENCE IN BOULDER, COLORADO. THERE ARE (3) NEW EXTERIOR DOORS IN EXISTING LOCATIONS A | $62,000 |
| BLD-SFA2023-00001 | 2023-11-01 | General construction | 66 ARAPAHOE AVE | Building D: New 2-story duplex with attached one car garages, designed per approved Pattern Book and annexation agreement. | $800,000 |
| BLD-NRE2023-00067 | 2023-10-30 | General construction | 2905 BASELINE RD | Grey shell alteration of a former restaurant building. | $51,410 |
| BLD-SFD2023-00296 | 2023-10-03 | General construction | 905 15TH ST | SCOPE OF WORK INCLUDES CONVERSION OF EXISTING REAR ENTRY INTO BEDROOM AND MUD ROOM. ONE SET OF EXTERIOR WINDOWS TO BE REPLACED WITH NEW EXTERIOR DOOR AND SIDE LITE. WASHER AND DRY | $20,000 |
| BLD-SFA2023-00010 | 2023-06-29 | General construction | 1020 15TH ST | Interior renovation of the main level unit of a legal non-conforming triplex. Scope includes kitchen remodel, partial removal of partition wall at living room, removal of 3 stairs, | $38,000 |
| BLD-SFD2022-00553 | 2023-05-22 | General construction | 535 S 43RD ST | Full interior remodel of basement and main level. Enclosure of existing carport to became attached car garage. | $172,105 |
| BLD-ACC2022-00052 | 2023-03-13 | General construction | 2426 PINE ST | New detached 794 sf ADU and 789 sf garage, AUR2021-00029. Associated MEPs. 200 amp electrical service. AUR2021-00029. | $200,000 |
| BLD-SFA2022-00045 | 2022-11-22 | General construction | 48 ARAPAHOE AVE | Building C: 48, 50, 52, & 54 Arapahoe (townhouses): Renovation of an existing historic structure at Saddle Creek (formerly 90 Arapahoe). The existing structure will undergo a renov | $800,000 |
| BLD-SFA2022-00044 | 2022-11-22 | General construction | 44 ARAPAHOE AVE | Building B: 44 and 46 Arapahoe (duplex): Single-story duplex with a crawlspace. Renovation of an existing historic structure at Saddle Creek (formerly 90 Arapahoe). Existing struct | $600,000 |
| PLB2022-00375 | 2022-07-12 | Plumbing | 1216 PLEASANT ST | **Voided for inactivity** Replace existing shower valve | $1,250 |
| PLB2022-00256 | 2022-04-11 | Plumbing | 1441 BROADWAY | Replace four bathroom shower valves | $20,000 |
| BLD-SFA2020-00024 | 2022-02-08 | General construction | 805 30TH ST | *New two story duplex building (4 bedrooms/per) with parking in the rear. Each unit to be 1295 sf. Associated with FLD2020-00100 and WET2020-00017. | $518,000 |
| BLD-SFD2021-00485 | 2022-01-24 | General construction | 2426 PINE ST | 1326 sf addition to existing 771 sf single-family residential structure. Proposed structure to have (3) bedrooms and 2.5 bathrooms. Addition includes 423 sf rear porch. | $213,956 |
| BLD-ACC2021-00094 | 2021-12-02 | General construction | 4400 OSAGE DR | New accessory building with: 2-car garage; workshop and powder room for the exclusive use of the occupant of the primary structure; a 526 sf detached ADU. Prior approvals AUR2020 | $175,000 |
| BLD-SFD2021-00262 | 2021-08-13 | General construction | 2426 PINE ST | Replace rock foundation for a concrete foundation. The house will be lifted in place, the rock foundation will be removed and a new concrete foundation will be poured in place. Sco | $63,786 |
| BLD-MFD2021-00028 | 2021-08-10 | General construction | 904 UNIVERSITY AVE | KRM Interior alterations to a legal non-conforming fourplex with a rooming unit. The scope includes reconfiguration of the interior stairs connecting the two stories and upgrade o | $75,000 |
| BLD-SFD2021-00164 | 2021-07-29 | General construction | 734 MAXWELL AVE | Basement: finish entire unfinished basement. 1st Floor: New windows, minor alterations, relocate bathroom. 2nd Floor: 58 sf addition, alterations, add skylights. New mini-splits | $135,000 |
| MEC2021-00587 | 2021-07-29 | Mechanical / HVAC | 734 MAXWELL AVE | Basement: finish entire unfinished basement. 1st Floor: New windows, minor alterations, relocate bathroom. 2nd Floor: 58 sf addition, alterations, add skylights. New mini-splits | $12,500 |
| PLB2021-00203 | 2021-07-29 | Plumbing | 734 MAXWELL AVE | Basement: finish entire unfinished basement. 1st Floor: New windows, minor alterations, relocate bathroom. 2nd Floor: 58 sf addition, alterations, add skylights. New mini-splits | $8,000 |
| ELE2021-00491 | 2021-07-29 | Electrical | 734 MAXWELL AVE | Basement: finish entire unfinished basement. 1st Floor: New windows, minor alterations, relocate bathroom. 2nd Floor: 58 sf addition, alterations, add skylights. New mini-splits | $10,000 |
| ELE2021-00637 | 2021-05-15 | Electrical | 2426 PINE ST | New Electrical temp power | $0 |
| DEM2021-00028 | 2021-05-14 | Demolition | 2426 PINE ST | VOID- 180 days no activity Deconstruction of a detached garage, 250 sf, originally constructed in 1910. | $0 |
| DEM2021-00005 | 2021-02-10 | Demolition | 805 30TH ST | *Full structure demo of a daycare facility, built in 1965, 2382 sf. | $0 |
| DEM2020-00076 | 2020-12-08 | Demolition | 2442 BLUFF ST | *Full structure demolition of existing single family dwelling. Related to ENF2020-01022 and HIS2020-00041. | $0 |
| BLD-SFD2020-00307 | 2020-11-10 | General construction | 2442 BLUFF ST | *New construction of single-family dwelling. One-story with walkout basement. Includes 492 sf at-grade patio (341 sf covered). No changes to existing ADU and garage. Full MEPs. Dem | $470,000 |
| BLD-ACC2020-00079 | 2020-07-06 | General construction | 2442 BLUFF ST | *Converting an existing, legally established owners accessory unit, located over the detached garage, into an accessory dwelling unit under current code requirements. ABOVE IT TO | $61 |
| BLD-SFA2020-00014 | 2020-06-11 | General construction | 2121 WALNUT ST | *Rebuild of a rear addition and interior remodel of an existing duplex. Remodel includes both kitchen, addition of a full bath, and remodel of existing baths. Addition includes a | $60,499 |
| BLD-TWN2020-00007 | 2020-05-27 | General construction | 1327 PINE ST | *Unit 3: Interior remodel of existing townhome. Scope includes kitchen reconfiguration and stair railing. | $10,000 |
| BLD-SFD2020-00106 | 2020-05-19 | General construction | 2910 19TH ST | *Voided for inactivity - no inspections within 180 days* *Remodel and addition to existing single family home. Addition for new front porch and entry vestibule. | $120,000 |
| BLD-SFD2019-00129 | 2020-03-05 | General construction | 734 MAXWELL AVE | Excavation of existing crawl space to create 837 sf basement space with exterior window/light well. See HIS2017-00358. Minor remodel scope of approximately 40 sf on main level to r | $225,000 |
| BLD-MFD2019-00066 | 2020-02-26 | General construction | 795 30TH ST | Internal remodel of existing dwelling unit and daycare to remove the daycare and establish two additional dwellings, creating a triplex. Scope includes reconfiguration of walls on | $205,000 |
| BLD-SFD2020-00008 | 2020-01-09 | General construction | 2910 19TH ST | Repair of existing floor joists in kitchen, dining room, and bedroom. Additional structural repair scope listed in engineer's letter to be completed under separate permit. Explore | $1,819 |
| BLD-MFD2019-00072 | 2020-01-03 | General construction | 2915 BASELINE RD 313 | Remodel to remove a wall to address ENF2019-01098. Approximately 40 sf. Includes electrical scope to remove outlets. | $2,600 |
| BLD-SFA2019-00027 | 2019-12-27 | General construction | 1845 17TH ST | Interior, nonstructural conversion of nonconforming triplex into a duplex through the removal of a kitchen located in a bedroom. | $849 |
| ELE2019-01536 | 2019-12-27 | Electrical | 1845 17TH ST | Interior, nonstructural conversion of nonconforming triplex into a duplex through the removal of a kitchen located in a bedroom. | $150 |
| PLB2019-00678 | 2019-12-27 | Plumbing | 1845 17TH ST | Interior, nonstructural conversion of nonconforming triplex into a duplex through the removal of a kitchen located in a bedroom. | $150 |
| BLD-SFA2019-00029 | 2019-11-13 | General construction | 843 17TH ST | Repair of concrete porch in accordance with engineered design, dated 11/12/19. Hand railing and guard to remain in place. | $4,000 |
| BLD-ACC2019-00170 | 2019-10-09 | General construction | 734 MAXWELL AVE | Removal of shower in existing detached studio building. Non-standard setback approved under BOZ2019-19. | $2,250 |
| BLD-SFA2019-00022 | 2019-09-09 | General construction | 1619 ARAPAHOE AVE | Removal of basement finishes and associated electrical to return basement to unfinished state to address CPL2017-01159. See associated FLD2019-00154. | $4,335 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Boulder permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
