COMPANY RECORD · BOULDER, CO
Adai Construction LLC — permit history in Boulder, CO
Adai Construction LLC appears on 33 Boulder permit records from 2015 through 2026, most often general construction (66.7% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 22 | 66.7% |
| Electrical | 5 | 15.2% |
| Plumbing | 4 | 12.1% |
| Mechanical / HVAC | 2 | 6.1% |
4 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2015 | 2 |
| 2016 | 3 |
| 2017 | 8 |
| 2018 | 3 |
| 2019 | 1 |
| 2020 | 3 |
| 2022 | 5 |
| 2023 | 2 |
| 2024 | 4 |
| 2025 | 1 |
| 2026 | 1 |
Busiest year on record: 2017, with 8 permits. One project can account for several filings, so read this as filing activity rather than workload.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 2020 BLUEBELL AVE | 2026-04-27 |
| 2905 ISLAND DR | 2025-05-01 |
| 1130 QUINCE AVE | 2024-10-23 |
| 340 18TH ST | 2024-07-03 |
| 2958 7TH ST | 2024-06-12 |
| 1403 BASELINE RD | 2023-08-22 |
| 707 NORTH ST | 2023-05-01 |
| 3538 22ND ST | 2022-11-29 |
| 435 VALLEY VIEW DR | 2022-08-22 |
| 3885 ORANGE CT | 2022-08-12 |
| 1343 BLUEBELL AVE | 2022-03-30 |
| 3830 19TH ST | 2020-12-09 |
| 1805 COLUMBINE AVE | 2020-01-16 |
| 112 CHEROKEE WAY | 2020-01-10 |
18 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $450 to $480,000, median $30,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
33 permits; open the full list
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| BLD-SFD2026-00070 | 2026-04-27 | General construction | 2020 BLUEBELL AVE | Bathroom remodel. Relocate shower and toilet. Widen doorway to 36". | $40,000 |
| BLD-SFD2025-00110 | 2025-05-01 | General construction | 2905 ISLAND DR | **EXTENSION REQUESTED** INTERIOR REMODEL TO A SINGLE FAMILY RESIDENCE AND REMODEL TO FRONT PORCH AND UPPER BEDROOM DECK ***7-6-26*** Updates to remove part of the scope including | $95,000 |
| BLD-SFD2024-00190 | 2024-10-23 | General construction | 1130 QUINCE AVE | -Primary Bathroom Alteration- addl. (28 sf) added to south side where a structural covered veranda is currently. -There is a jog on the non structural interior wall that will be r | $100,000 |
| BLD-SFD2024-00092 | 2024-07-03 | General construction | 340 18TH ST | Add cementitious stucco over existing wood siding, replace 1 window, replace 1 sliding patio door, remove existing deck and replace with larger deck. | $99,000 |
| BLD-SFD2023-00270 | 2024-06-12 | General construction | 2958 7TH ST | Level 4 alteration and addition to a detached single family residence, associated with the construction of new detached ADU approved per AUR2022-00012. Addition to include extendin | $300,000 |
| BLD-ACC2023-00076 | 2024-01-23 | General construction | 2958 7TH ST | Construction of new detached ADU approved per AUR2022-00012, associated with an addition and remodel of a single family detached dwelling under BLD-SFD2023-00270. New detached ADU | $480,000 |
| BLD-SFD2023-00234 | 2023-08-22 | General construction | 1403 BASELINE RD | 1) Bathroom 1 Alteration - Main Level (ML1): Relocate sink, remove shower, add tub, addition of stackable washer and dryer. Remodel 87 sf; NO added square foot. 2) Bathroom 2 Alter | $85,000 |
| BLD-SFD2023-00068 | 2023-05-01 | General construction | 707 NORTH ST | *Voided for inactivity - no inspections within 180 days* Remove existing window in home office. Resize rough opening. Install new window. | $8,000 |
| BLD-SFD2022-00501 | 2022-11-29 | General construction | 3538 22ND ST | Primary bathroom renovation. Remove partition wall and construct new partition walls. Move toilet and vanity locations. Install new recessed and wall mounted lighting. | $60,000 |
| BLD-SFD2022-00245 | 2022-08-22 | General construction | 435 VALLEY VIEW DR | Relocate gas stove and vent hood, install make-up air unit, delete window, install gas fireplace unit, remove partition wall and column, install new partition wall and built-ins in | $227,000 |
| BLD-SFD2022-00215 | 2022-08-12 | General construction | 3885 ORANGE CT | New attached accessory dwelling unit. Installation of kitchenette and new washer/dryer location in an existing finished basement of a detached single-family home,165 ft.². Total 7 | $30,000 |
| BLD-SFD2022-00070 | 2022-04-01 | General construction | 1130 QUINCE AVE | Kitchen remodel: 162 sf, Cabinet replacement, appliance replacement. Most appliances will maintain their location. We will move the dual-fuel oven range from the island to against | $110,000 |
| BLD-ACC2021-00155 | 2022-03-30 | General construction | 1343 BLUEBELL AVE | NEW 493 SF DETACHED ACCESSORY DWELLING UNIT LOCATED IN THE REAR YARD. AN ACCESSORY DWELLLING UNIT APPLICATION (AUR2021-00019) WAS APPROVED SEPT 19, 2021. | $148,000 |
| BLD-SFD2020-00482 | 2020-12-09 | General construction | 3830 19TH ST | Kitchen remodel 185 sf. Replace cabinets, add new window, add new island, move stove and refrigerator. Add new LED recessed lighting and pendant light. | $42,000 |
| BLD-SFD2020-00023 | 2020-01-16 | General construction | 1805 COLUMBINE AVE | Interior kitchen remodel of existing single family dwelling. Scope includes removal of non-structural interior wall, new finishes and cabinets, removal of kitchen island, relocatio | $41,667 |
| BLD-ACC2020-00003 | 2020-01-10 | General construction | 112 CHEROKEE WAY | Permit to replace an existing rear deck on a single family dwelling with a new set of stairs with landing. | $10,300 |
| BLD-SFD2019-00297 | 2019-07-11 | General construction | 2132 PINE ST | After the fact permit for addition of 80 sf deck to rear of existing single-family home. Structural per drawings by Lopez Smolens Associates. | $2,225 |
| PMT2018-01079-ELE | 2018-05-11 | Electrical | 2132 PINE ST | Interior remodel and structural modifications to existing single-family dwelling. Lower level: replacement of water heater, washer/dryer and furnace. Main level: Kitchen remodel re | $21,000 |
| PMT2018-01079-PLB | 2018-05-11 | Plumbing | 2132 PINE ST | Interior remodel and structural modifications to existing single-family dwelling. Lower level: replacement of water heater, washer/dryer and furnace. Main level: Kitchen remodel re | $13,000 |
| PMT2018-01079 | 2018-05-11 | General construction | 2132 PINE ST | Interior remodel and structural modifications to existing single-family dwelling. Lower level: replacement of water heater, washer/dryer and furnace. Main level: Kitchen remodel re | $207,000 |
| PMT2017-02201-MEC | 2017-05-23 | Mechanical / HVAC | 695 ITHACA DR | Kitchen remodel, main level, 250 sq.ft. Associated MEP's covered within the scope of this permit. Scope to include removing a load-bearing wall, see Engineer's specifications, and | $2,000 |
| PMT2017-02201-ELE | 2017-05-23 | Electrical | 695 ITHACA DR | Kitchen remodel, main level, 250 sq.ft. Associated MEP's covered within the scope of this permit. Scope to include removing a load-bearing wall, see Engineer's specifications, and | $6,000 |
| PMT2017-02201-PLB | 2017-05-23 | Plumbing | 695 ITHACA DR | Kitchen remodel, main level, 250 sq.ft. Associated MEP's covered within the scope of this permit. Scope to include removing a load-bearing wall, see Engineer's specifications, and | $2,450 |
| PMT2017-02201 | 2017-05-23 | General construction | 695 ITHACA DR | Kitchen remodel, main level, 250 sq.ft. Associated MEP's covered within the scope of this permit. Scope to include removing a load-bearing wall, see Engineer's specifications, and | $81,362 |
| PMT2017-00445-PLB | 2017-02-15 | Plumbing | 1605 COLUMBINE AV | Remodel to include guest bathroom and master bathroom remodel on second floor and associated electrical, mechanical, and plumbing. | $6,244 |
| PMT2017-00445-MEC | 2017-02-15 | Mechanical / HVAC | 1605 COLUMBINE AV | Remodel to include guest bathroom and master bathroom remodel on second floor and associated electrical, mechanical, and plumbing. | $450 |
| PMT2017-00445 | 2017-02-15 | General construction | 1605 COLUMBINE AV | Remodel to include guest bathroom and master bathroom remodel on second floor and associated electrical, mechanical, and plumbing. | $68,678 |
| PMT2017-00445-ELE | 2017-02-15 | Electrical | 1605 COLUMBINE AV | Remodel to include guest bathroom and master bathroom remodel on second floor and associated electrical, mechanical, and plumbing. | $7,000 |
| PMT2016-00522-ELE | 2016-02-08 | Electrical | 3130 14TH ST | Kitchen remodel. Scope of work includes associated plumbing and electrical work. | $2,700 |
| PMT2016-00522 | 2016-02-08 | General construction | 3130 14TH ST | Kitchen remodel. Scope of work includes associated plumbing and electrical work. | $7,400 |
| PMT2016-00522-PLB | 2016-02-08 | Plumbing | 3130 14TH ST | Kitchen remodel. Scope of work includes associated plumbing and electrical work. | $675 |
| PMT2015-04703 | 2015-10-22 | General construction | 3130 14TH ST | Interior structural remodel to replace walls surrounding interior staircase with two beams. One beam will be dropped below ceiling joist and the other beam will be installed in th | $6,000 |
| PMT2015-04703-ELE | 2015-10-22 | Electrical | 3130 14TH ST | Interior structural remodel to replace walls surrounding interior staircase with two beams. One beam will be dropped below ceiling joist and the other beam will be installed in th | $1,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Boulder permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
