COMPANY RECORD · NEW YORK, NY

Alliance Plumbing Corp — permit history in New York, NY

Alliance Plumbing Corp appears on 193 New York permit records from 2023 through 2025, most often plumbing (71.5% of the record).

Permit categories

CategoryPermitsShare
Plumbing19371.5%
Fire protection7728.5%

2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.

Activity by year

YearPermits issued
202363
2024116
202591

Busiest year on record: 2024, with 116 permits. One project can account for several filings, so read this as filing activity rather than workload.

Named on the same permit

Name in sourceLinked permitsLast seen
Empire General Contractin182025-09-05
Structure Tone, LLC152025-07-29
Jgn Construction Corp152025-08-27
Consigli Construction Co102025-08-26
Hellman Construction Co92025-04-10
Hunter Roberts Constructi92025-09-05
Lendlease(Us)Construction82025-06-16
Cauldwell Wingate Co LLC52025-09-02
Gilbane Building Company52025-09-05
L.F. Driscoll Company LLC32024-12-23
Paul M Maintenance Inc32025-05-29
B.R. Fries & Associates L32025-03-13

26 companies are named alongside Alliance Plumbing Corp on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.

Where they worked

Address in sourceMost recent permit
110 EAST 60 STREET2025-09-05
1720 VILLAGE LANE2025-09-05
1002 48 STREET2025-09-05
1468 MADISON AVENUE2025-09-02
177 FORT WASHINGTON AVENUE2025-08-28
1275 YORK AVENUE2025-08-27
1190 FIFTH AVENUE2025-08-26
56-45 MAIN STREET2025-08-25
2601 OCEAN PARKWAY2025-08-22
1545 ATLANTIC AVENUE2025-08-13
622 WEST 168 STREET2025-07-29
1293 BROADWAY2025-07-29
515 6 STREET2025-07-17
1250 1 AVENUE2025-07-08

95 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $6,684,653, median $118,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

193 permits; open the 50 most recent
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
M01226079-S2-PL2025-09-05Plumbing110 EAST 60 STREETPLUMBING MODIFICATIONS INCLUDING REMOVAL OF DEAD END WATER/SANITARY PIPING AND INSTALLATION OF NEW PLUMBING FIXTURE AND RELATED PIPING AS INDICATED ON THE PLANS FILED HEREWITH. NO $197,725
Q01215133-S2-PL2025-09-05Plumbing1720 VILLAGE LANEPLUMBING AND SPRINKLER MODIFICATIONS TO ACCOMMODATE ALTERATIONS FOR NEW MEDICAL OFFICES AT THE 2ND FLOOR AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$2,980,000
B01142538-S4-PL2025-09-05Plumbing1002 48 STREETPlumbing work filed herewith in conjunction with General Construction work filed under job # B01142538-I1$20,000
Q01215133-S2-PL2025-09-05Fire protection1720 VILLAGE LANEPLUMBING AND SPRINKLER MODIFICATIONS TO ACCOMMODATE ALTERATIONS FOR NEW MEDICAL OFFICES AT THE 2ND FLOOR AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$2,980,000
M01200913-S2-PL2025-09-02Plumbing1468 MADISON AVENUEInstallation of new plumbing fixtures and associated piping, medical gas piping$215,000
M00996233-S1-PL2025-08-28Plumbing177 FORT WASHINGTON AVENUEMHB CATH LAB D: PLUMBING AND SPRINKLER WORK TO ACCOMMODATE THE CATH LAB RENOVATION IN THE EXISTING HOSPITAL BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$76,000
M00996233-S1-PL2025-08-28Fire protection177 FORT WASHINGTON AVENUEMHB CATH LAB D: PLUMBING AND SPRINKLER WORK TO ACCOMMODATE THE CATH LAB RENOVATION IN THE EXISTING HOSPITAL BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$76,000
M00808137-S3-PL2025-08-27Fire protection1275 YORK AVENUEModifications to the existing Plumbing and Sprinkler systems. No change in occupancy, use or egress.$430,000
M00808137-S3-PL2025-08-27Plumbing1275 YORK AVENUEModifications to the existing Plumbing and Sprinkler systems. No change in occupancy, use or egress.$430,000
M01214516-S2-PL2025-08-26Plumbing1190 FIFTH AVENUEMOUNT SINAI - GUGGENHEIM GP1 CT - PLUMBING MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGES IN USE, EGRESS, OR OCCUPANCY.$224,550
M01181612-S2-PL2025-08-26Plumbing1190 FIFTH AVENUEPlumbing Modifications as shown on plans filed herewith. No change in egress, occupancy or use.$269,000
Q01170734-S2-PL2025-08-25Plumbing56-45 MAIN STREETNYPQ - RADIOLOGY RENO - PLUMBING MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGES IN USE, EGRESS, OR OCCUPANCY.$20,000
M01169687-S2-PL2025-08-22Plumbing1468 MADISON AVENUECap and remove plumbing fixtures and associated piping$3,200
B01205124-S2-PL2025-08-22Plumbing2601 OCEAN PARKWAYPROPOSED PLUMBING WORK RELATED TO THE INTERIOR RENOVATION ON THE EIGHTH FLOOR OF SOUTH BROOKLYN HEALTH HOSPITAL. ALL AS PER PLANS FILED HEREWITH$1,300,088
B00999648-S2-PL2025-08-13Plumbing1545 ATLANTIC AVENUEIMC 9 FL: SPRINKLER AND PLUMBING REMOVALS ALONG WITH INSTALLATION OF TEMP SP LOOP AT THE 9TH FLOOR OF THE EXISTING HOSPITAL BIULDING AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUP$40,000
B00999648-S2-PL2025-08-13Fire protection1545 ATLANTIC AVENUEIMC 9 FL: SPRINKLER AND PLUMBING REMOVALS ALONG WITH INSTALLATION OF TEMP SP LOOP AT THE 9TH FLOOR OF THE EXISTING HOSPITAL BIULDING AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUP$40,000
Q01249601-S1-PL2025-08-01Plumbing56-45 MAIN STREETNYPQ - Plumbing modifications on basement and roof levels as per shown on plans filed herewith. No change in egress, occupancy or use.$2,000,000
M01247419-S1-PL2025-07-29Fire protection622 WEST 168 STREETRemove and install new plumbing fixtures and piping including medical gas piping; associated sprinkler work; all work on partial 3rd floor to accommodate the MRI Suite renovation a$210,100
M01247419-S1-PL2025-07-29Plumbing622 WEST 168 STREETRemove and install new plumbing fixtures and piping including medical gas piping; associated sprinkler work; all work on partial 3rd floor to accommodate the MRI Suite renovation a$210,100
M01145874-S2-PL2025-07-29Plumbing1293 BROADWAYPlumbing scope for Removal of fixtures$50,000
B01231625-S1-PL2025-07-17Plumbing515 6 STREETBMH Pumps: Plumbing modifications as per plans to accommodate installation of storm water pumps. No change to use, egress or occupancy.$700,000
M00882939-I1-PL2025-07-08Plumbing1250 1 AVENUEHouse pump and domestic/fire reserve tank replacement. Modifications to floor drains as shown on drawings. No change in use, egress or occupancy.$650,000
M01231615-I1-PL2025-06-25Plumbing722 WEST 168 STREETFiling to show existing plumbing fixtures as installed by DASNY prior to CUMC ownership. work performed under job 104264207 and 103955506$100,000
Q01239007-I1-PL2025-06-25Plumbing56-45 MAIN STREETNYPQ OR UPGRADES - PLUMBING MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$110,715
M01046415-S3-PL2025-06-25Plumbing171 DELANCEY STREETModification to plumbing systems as per plans.$10,000
M01177036-S1-PL2025-06-20Plumbing177 FORT WASHINGTON AVENUEMHB GN BEHAVIORAL HEALTH: PLUMBING AND SPRINKLER MODIFICATIONS TO ACCOMMODATE THE BEHAVIORAL HEALTH RENOVATION IN THE EXISTING HOSPITAL BUILDING. NO CHANGE TO USE, EGRESS OR OCCUP$1,420,000
M01177036-S1-PL2025-06-20Fire protection177 FORT WASHINGTON AVENUEMHB GN BEHAVIORAL HEALTH: PLUMBING AND SPRINKLER MODIFICATIONS TO ACCOMMODATE THE BEHAVIORAL HEALTH RENOVATION IN THE EXISTING HOSPITAL BUILDING. NO CHANGE TO USE, EGRESS OR OCCUP$1,420,000
M01113609-S3-PL2025-06-17Fire protection1275 YORK AVENUEModifications to the existing Plumbing and Sprinkler system on the 3rd floor. No change in occupancy, use or egress.$850,000
M01113609-S3-PL2025-06-17Plumbing1275 YORK AVENUEModifications to the existing Plumbing and Sprinkler system on the 3rd floor. No change in occupancy, use or egress.$850,000
M01177411-S2-PL2025-06-16Fire protection300 EAST 66 STREETModifications to the existing Plumbing and Sprinkler system on the 6th floor. No change in occupancy, use or egress.$160,875
M01177411-S2-PL2025-06-16Plumbing300 EAST 66 STREETModifications to the existing Plumbing and Sprinkler system on the 6th floor. No change in occupancy, use or egress.$160,875
M01207581-S1-PL2025-06-12Plumbing541 EAST 68 STREETGP2 Fellows: PLUMBING MODIFICATIONS TO ACCOMMODATE THE FELLOWS TEAM ROOM MODIFICATIONS, GREENBERG PAVILION, IN THE EXISTING HOSPITAL BUILDING. NO CHANGE TO ZONING, USE, EGRESS OR O$40,745
M01198380-S1-PL2025-06-05Plumbing3975 BROADWAYCHNY North ENDO: Plumbing and sprinkler modifications to accommodate the endo suite renovation on partial 3rd floor in the existing hospital building as per plans filed herewith.$113,300
M01198380-S1-PL2025-06-05Fire protection3975 BROADWAYCHNY North ENDO: Plumbing and sprinkler modifications to accommodate the endo suite renovation on partial 3rd floor in the existing hospital building as per plans filed herewith.$113,300
Q01208653-S2-PL2025-06-05Plumbing56-45 MAIN STREETNYPQ OR UPGRADES - PLUMBING MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGES IN USE, EGRESS, OR OCCUPANCY.$20,000
M01022106-S4-PL2025-06-01Plumbing1091 AMSTERDAM AVENUEHerewith filing plumbing modifications for Mount Sinai Morningside Stuyvesant Basement AHU Replacement - Phase 2. No change in use, egress, or occupancy.$50,000
M01214956-S2-PL2025-05-29Plumbing1180 FIFTH AVENUEPlumbing modifications on Cellar Level as shown plans filed herewith. No change in egress, occupancy, or use.$20,785
M01221326-S2-PL2025-05-29Plumbing450 EAST 29 STREETPlumbing modification as shown on the drawings filed herewith. No change to occupancy, use, or egress.$30,000
M01224950-I1-PL2025-05-22Fire protection620 WEST 168 STREETRemove and install new plumbing piping and fixtures, and replace sprinkler heads and piping on partial 1st floor in the existing Emergency Department to accommodate CT installation$299,875
M01224950-I1-PL2025-05-22Plumbing620 WEST 168 STREETRemove and install new plumbing piping and fixtures, and replace sprinkler heads and piping on partial 1st floor in the existing Emergency Department to accommodate CT installation$299,875
M01022745-S3-PL2025-05-21Fire protection411 EAST 67 STREETModifications to the existing Plumbing and Sprinkler systems on the 3rd floor. No change in occupancy, use or egress.$97,000
M01022745-S3-PL2025-05-21Plumbing411 EAST 67 STREETModifications to the existing Plumbing and Sprinkler systems on the 3rd floor. No change in occupancy, use or egress.$97,000
M01162160-S1-PL2025-05-16Fire protection3959 BROADWAYCHNY Bed Tower LABOR AND DELIVERY:. Plumbing and sprinkler modifications to accommodate the labor and delivery sterile supply refurbishment at the existing hospital building. No c$25,000
M01162160-S1-PL2025-05-16Plumbing3959 BROADWAYCHNY Bed Tower LABOR AND DELIVERY:. Plumbing and sprinkler modifications to accommodate the labor and delivery sterile supply refurbishment at the existing hospital building. No c$25,000
M01204817-S2-PL2025-05-13Plumbing3975 BROADWAYCHNY North EOS X-Ray: Remove and install new plumbing piping and fixtures on 3rd floor in the existing Hospital building as per plans filed herewith only.$6,976
M01204817-S2-PL2025-05-13Fire protection3975 BROADWAYCHNY North EOS X-Ray: Remove and install new plumbing piping and fixtures on 3rd floor in the existing Hospital building as per plans filed herewith only.$6,976
M01182885-I1-PL2025-05-01Plumbing368 NINTH AVENUEPlumbing work on the 4th floor as indicated on drawings.$2,000,000
M01191648-S1-PL2025-04-30Plumbing3975 BROADWAYOR#4 Modification to medical gas piping to accommodate renovation of Operating room 4 partial 4th floor in the existing hospital.$35,400
M01185482-I1-PL2025-04-25Plumbing541 EAST 68 STREETGP6 PICU: PLUMBING, SPRINKLER, AND STANDPIPE MODIFICATIONS TO ACCOMMODATE THE PEDIATRIC ICU RENOAVTION, GREENBERG PAVILION, IN THE EXISTING HOSPITAL BUILDING. NO CHANGE TO ZONING, $3,141,233
M01185482-I1-PL2025-04-25Fire protection541 EAST 68 STREETGP6 PICU: PLUMBING, SPRINKLER, AND STANDPIPE MODIFICATIONS TO ACCOMMODATE THE PEDIATRIC ICU RENOAVTION, GREENBERG PAVILION, IN THE EXISTING HOSPITAL BUILDING. NO CHANGE TO ZONING, $3,141,233

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public New York permit records through 2025, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →