COMPANY RECORD · SEATTLE, WA
Sunergy Systems Inc. — permit history in Seattle, WA
Sunergy Systems Inc. appears on 175 Seattle permit records from 2015 through 2025, all of them electrical.
Permit categories
| Category | Permits | Share |
|---|---|---|
| Electrical | 175 | 100% |
Activity by year
| Year | Permits issued |
|---|---|
| 2015 | 57 |
| 2016 | 53 |
| 2017 | 44 |
| 2018 | 20 |
| 2025 | 1 |
Busiest year on record: 2015, with 57 permits. One project can account for several filings, so read this as filing activity rather than workload.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 3118 W GOVERNMENT WAY | 2025-10-06 |
| 1217 FEDERAL AVE E | 2018-04-26 |
| 12005 7TH AVE NW | 2018-04-25 |
| 13564 39TH AVE NE | 2018-04-20 |
| 3112 E HARRISON ST | 2018-04-06 |
| 1225 NE 104TH ST | 2018-04-02 |
| 522 32ND AVE S | 2018-03-27 |
| 1221 3RD AVE N | 2018-03-22 |
| 4317 5TH AVE NW | 2018-03-15 |
| 6921 ROOSEVELT WAY NE | 2018-03-15 |
| 3029 FAIRMOUNT AVE SW | 2018-03-14 |
| 1531 CHERRYLANE PL S | 2018-03-08 |
| 7135 BEACH DR SW | 2018-03-02 |
| 1428 36TH AVE | 2018-02-16 |
156 distinct addresses on record; the 14 most recent are shown. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
175 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| 7109674-EL | 2025-10-06 | Electrical | 3118 W GOVERNMENT WAY | PHOTOVOLTAIC PITCHED ROOF MOUNTED SYSTEM6.300 KW DC/6.020 KW AC/5.719 KW CEC AC& ENERGY STORAGE SYSTEM - 15 KWH [10/6/25 BGO - Approved PV+ESS Plan Set] | $47,712 |
| 6658795-EL | 2018-04-26 | Electrical | 1217 FEDERAL AVE E | [A ONE-LINE DIAGRAM WILL BE REQUIRED ON SITE AT THE TIME OF INSPECTION OF ANY RENEWABLE ENERGY SYSTEM. A COVER INSPECTION IS REQUIRED BEFORE INSTALLATION BEGINS, BUT AFTER THE EQU | |
| 6658441-EL | 2018-04-25 | Electrical | 12005 7TH AVE NW | [A ONE-LINE DIAGRAM WILL BE REQUIRED ON SITE AT THE TIME OF INSPECTION OF ANY RENEWABLE ENERGY SYSTEM. A COVER INSPECTION IS REQUIRED BEFORE INSTALLATION BEGINS, BUT AFTER THE EQU | |
| 6657596-EL | 2018-04-20 | Electrical | 13564 39TH AVE NE | 50A NEMA 14-50 RECEPTACLE IN GARAGE FOR ON-BOARD CAR CHARGER | |
| 6655413-EL | 2018-04-10 | Electrical | 13564 39TH AVE NE | [A ONE-LINE DIAGRAM WILL BE REQUIRED ON SITE AT THE TIME OF INSPECTION OF ANY RENEWABLE ENERGY SYSTEM. A COVER INSPECTION IS REQUIRED BEFORE INSTALLATION BEGINS, BUT AFTER THE EQU | |
| 6654970-EL | 2018-04-06 | Electrical | 3112 E HARRISON ST | [A ONE-LINE DIAGRAM WILL BE REQUIRED ON SITE AT THE TIME OF INSPECTION OF ANY RENEWABLE ENERGY SYSTEM. A COVER INSPECTION IS REQUIRED BEFORE INSTALLATION BEGINS, BUT AFTER THE EQU | |
| 6653998-EL | 2018-04-02 | Electrical | 1225 NE 104TH ST | [A ONE-LINE DIAGRAM WILL BE REQUIRED ON SITE AT THE TIME OF INSPECTION OF ANY RENEWABLE ENERGY SYSTEM. A COVER INSPECTION IS REQUIRED BEFORE INSTALLATION BEGINS, BUT AFTER THE EQU | |
| 6652814-EL | 2018-03-27 | Electrical | 522 32ND AVE S | INSTALL CUSTOMER PURCHASED EV CHARGER | |
| 6652216-EL | 2018-03-22 | Electrical | 1221 3RD AVE N | INSTALL NEMA 14-50 OUTLET ON 30A CIRCUIT AND BREAKER. | |
| 6650921-EL | 2018-03-15 | Electrical | 4317 5TH AVE NW | [A ONE-LINE DIAGRAM WILL BE REQUIRED ON SITE AT THE TIME OF INSPECTION OF ANY RENEWABLE ENERGY SYSTEM. A COVER INSPECTION IS REQUIRED BEFORE INSTALLATION BEGINS, BUT AFTER THE EQU | |
| 6650859-EL | 2018-03-15 | Electrical | 6921 ROOSEVELT WAY NE | [A ONE-LINE DIAGRAM WILL BE REQUIRED ON SITE AT THE TIME OF INSPECTION OF ANY RENEWABLE ENERGY SYSTEM. A COVER INSPECTION IS REQUIRED BEFORE INSTALLATION BEGINS, BUT AFTER THE EQU | |
| 6650621-EL | 2018-03-14 | Electrical | 3029 FAIRMOUNT AVE SW | [A ONE-LINE DIAGRAM WILL BE REQUIRED ON SITE AT THE TIME OF INSPECTION OF ANY RENEWABLE ENERGY SYSTEM. A COVER INSPECTION IS REQUIRED BEFORE INSTALLATION BEGINS, BUT AFTER THE EQU | |
| 6649543-EL | 2018-03-08 | Electrical | 1531 CHERRYLANE PL S | INSTALLATION OF NEMA 14-50 RECEPTACLE IN GARAGE | |
| 6648353-EL | 2018-03-02 | Electrical | 7135 BEACH DR SW | [A ONE-LINE DIAGRAM WILL BE REQUIRED ON SITE AT THE TIME OF INSPECTION OF ANY RENEWABLE ENERGY SYSTEM. A COVER INSPECTION IS REQUIRED BEFORE INSTALLATION BEGINS, BUT AFTER THE EQU | |
| 6646131-EL | 2018-02-16 | Electrical | 1428 36TH AVE | [A ONE-LINE DIAGRAM WILL BE REQUIRED ON SITE AT THE TIME OF INSPECTION OF ANY RENEWABLE ENERGY SYSTEM. A COVER INSPECTION IS REQUIRED BEFORE INSTALLATION BEGINS, BUT AFTER THE EQU | |
| 6645499-EL | 2018-02-14 | Electrical | 1808 12TH AVE S | [A ONE-LINE DIAGRAM WILL BE REQUIRED ON SITE AT THE TIME OF INSPECTION OF ANY RENEWABLE ENERGY SYSTEM. A COVER INSPECTION IS REQUIRED BEFORE INSTALLATION BEGINS, BUT AFTER THE EQU | |
| 6643038-EL | 2018-01-31 | Electrical | 6747 PALATINE AVE N | [A ONE-LINE DIAGRAM WILL BE REQUIRED ON SITE AT THE TIME OF INSPECTION OF ANY RENEWABLE ENERGY SYSTEM. A COVER INSPECTION IS REQUIRED BEFORE INSTALLATION BEGINS, BUT AFTER THE EQU | |
| 6641314-EL | 2018-01-22 | Electrical | 830-B 15TH AVE | [A ONE-LINE DIAGRAM WILL BE REQUIRED ON SITE AT THE TIME OF INSPECTION OF ANY RENEWABLE ENERGY SYSTEM. A COVER INSPECTION IS REQUIRED BEFORE INSTALLATION BEGINS, BUT AFTER THE EQU | |
| 6639930-EL | 2018-01-12 | Electrical | 6604 HIGH POINT DR SW | A ONE-LINE DIAGRAM WILL BE REQUIRED ON SITE AT THE TIME OF INSPECTION OF ANY RENEWABLE ENERGY SYSTEM. A COVER INSPECTION IS REQUIRED BEFORE INSTALLATION BEGINS, BUT AFTER THE EQUI | |
| 6639582-EL | 2018-01-11 | Electrical | 9745 DAYTON AVE N | RUN 50A CIRCUIT FOR NEMA 14-50 RECEPTACLE IN GARGAGE FOR EV CHARGER. | |
| 6638406-EL | 2018-01-04 | Electrical | 809 N 60TH ST | [A ONE-LINE DIAGRAM WILL BE REQUIRED ON SITE AT THE TIME OF INSPECTION OF ANY RENEWABLE ENERGY SYSTEM. A COVER INSPECTION IS REQUIRED BEFORE INSTALLATION BEGINS, BUT AFTER THE EQU | |
| 6636726-EL | 2017-12-21 | Electrical | 4018 GREENWOOD AVE N | [A ONE-LINE DIAGRAM WILL BE REQUIRED ON SITE AT THE TIME OF INSPECTION OF ANY RENEWABLE ENERGY SYSTEM. A COVER INSPECTION IS REQUIRED BEFORE INSTALLATION BEGINS, BUT AFTER THE EQU | |
| 6636429-EL | 2017-12-20 | Electrical | 2511 22ND AVE E | [A ONE-LINE DIAGRAM WILL BE REQUIRED ON SITE AT THE TIME OF INSPECTION OF ANY RENEWABLE ENERGY SYSTEM. A COVER INSPECTION IS REQUIRED BEFORE INSTALLATION BEGINS, BUT AFTER THE EQU | |
| 6633497-EL | 2017-12-05 | Electrical | 3509 MERIDIAN AVE N | [A ONE-LINE DIAGRAM WILL BE REQUIRED ON SITE AT THE TIME OF INSPECTION OF ANY RENEWABLE ENERGY SYSTEM. A COVER INSPECTION IS REQUIRED BEFORE INSTALLATION BEGINS, BUT AFTER THE EQU | |
| 6633476-EL | 2017-12-05 | Electrical | 7357 16TH AVE NW | [A ONE-LINE DIAGRAM WILL BE REQUIRED ON SITE AT THE TIME OF INSPECTION OF ANY RENEWABLE ENERGY SYSTEM. A COVER INSPECTION IS REQUIRED BEFORE INSTALLATION BEGINS, BUT AFTER THE EQU | |
| 6631570-EL | 2017-11-21 | Electrical | 11733 12TH AVE NE | [A ONE-LINE DIAGRAM WILL BE REQUIRED ON SITE AT THE TIME OF INSPECTION OF ANY RENEWABLE ENERGY SYSTEM. A COVER INSPECTION IS REQUIRED BEFORE INSTALLATION BEGINS, BUT AFTER THE EQU | |
| 6630320-EL | 2017-11-14 | Electrical | 4037 32ND AVE W | [A ONE-LINE DIAGRAM WILL BE REQUIRED ON SITE AT THE TIME OF INSPECTION OF ANY RENEWABLE ENERGY SYSTEM. A COVER INSPECTION IS REQUIRED BEFORE INSTALLATION BEGINS, BUT AFTER THE EQU | |
| 6629415-EL | 2017-11-09 | Electrical | 7049 9TH AVE NW | [A ONE-LINE DIAGRAM WILL BE REQUIRED ON SITE AT THE TIME OF INSPECTION OF ANY RENEWABLE ENERGY SYSTEM. A COVER INSPECTION IS REQUIRED BEFORE INSTALLATION BEGINS, BUT AFTER THE EQU | |
| 6629480-EL | 2017-11-09 | Electrical | 2708 NE 135TH ST | [A ONE-LINE DIAGRAM WILL BE REQUIRED ON SITE AT THE TIME OF INSPECTION OF ANY RENEWABLE ENERGY SYSTEM. A COVER INSPECTION IS REQUIRED BEFORE INSTALLATION BEGINS, BUT AFTER THE EQU | |
| 6628305-EL | 2017-11-03 | Electrical | 11517 NORTH PARK AVE N | [A ONE-LINE DIAGRAM WILL BE REQUIRED ON SITE AT THE TIME OF INSPECTION OF ANY RENEWABLE ENERGY SYSTEM. A COVER INSPECTION IS REQUIRED BEFORE INSTALLATION BEGINS, BUT AFTER THE EQU | |
| 6626194-EL | 2017-10-24 | Electrical | 116 37TH AVE E | [A ONE-LINE DIAGRAM WILL BE REQUIRED ON SITE AT THE TIME OF INSPECTION OF ANY RENEWABLE ENERGY SYSTEM. A COVER INSPECTION IS REQUIRED BEFORE INSTALLATION BEGINS, BUT AFTER THE EQU | |
| 6626228-EL | 2017-10-24 | Electrical | 8051 CORLISS AVE N | [A ONE-LINE DIAGRAM WILL BE REQUIRED ON SITE AT THE TIME OF INSPECTION OF ANY RENEWABLE ENERGY SYSTEM. A COVER INSPECTION IS REQUIRED BEFORE INSTALLATION BEGINS, BUT AFTER THE EQU | |
| 6626296-EL | 2017-10-24 | Electrical | 10017 35TH AVE NE | INSTALL CHARGEPOINT EV CHARGER, 40A BREAKER. | |
| 6623918-EL | 2017-10-12 | Electrical | 12066 PALATINE AVE N | ADD SUBPANEL AND 50A 240V CIRCUIT RECEPTACLE | |
| 6623423-EL | 2017-10-10 | Electrical | 741 HARVARD AVE E | [A ONE-LINE DIAGRAM WILL BE REQUIRED ON SITE AT THE TIME OF INSPECTION OF ANY RENEWABLE ENERGY SYSTEM. A COVER INSPECTION IS REQUIRED BEFORE INSTALLATION BEGINS, BUT AFTER THE EQU | |
| 6623287-EL | 2017-10-09 | Electrical | 1222 MCGILVRA BLVD E | [A ONE-LINE DIAGRAM WILL BE REQUIRED ON SITE AT THE TIME OF INSPECTION OF ANY RENEWABLE ENERGY SYSTEM. A COVER INSPECTION IS REQUIRED BEFORE INSTALLATION BEGINS, BUT AFTER THE EQU | |
| 6622662-EL | 2017-10-05 | Electrical | 8056 DIBBLE AVE NW | [A ONE-LINE DIAGRAM WILL BE REQUIRED ON SITE AT THE TIME OF INSPECTION OF ANY RENEWABLE ENERGY SYSTEM. A COVER INSPECTION IS REQUIRED BEFORE INSTALLATION BEGINS, BUT AFTER THE EQU | |
| 6621322-EL | 2017-09-27 | Electrical | 12066 PALATINE AVE N | [A ONE-LINE DIAGRAM WILL BE REQUIRED ON SITE AT THE TIME OF INSPECTION OF ANY RENEWABLE ENERGY SYSTEM. A COVER INSPECTION IS REQUIRED BEFORE INSTALLATION BEGINS, BUT AFTER THE EQU | |
| 6620529-EL | 2017-09-22 | Electrical | 7323 VASHON PL SW | [A ONE-LINE DIAGRAM WILL BE REQUIRED ON SITE AT THE TIME OF INSPECTION OF ANY RENEWABLE ENERGY SYSTEM. A COVER INSPECTION IS REQUIRED BEFORE INSTALLATION BEGINS, BUT AFTER THE EQU | |
| 6616806-EL | 2017-09-01 | Electrical | 6242 31ST AVE NE | UPGRADE SERVICE TO FROM 125A TO 200A, INCLUDING METER AND SERVICE PANEL. UPGRADE SUBPANEL IN GARAGE TO 80A FEEDERS, TRENCH, 50A RECEPTACLE IN GARAGE. | |
| 6614818-EL | 2017-08-22 | Electrical | 6722 EARL AVE NW | [A ONE-LINE DIAGRAM WILL BE REQUIRED ON SITE AT THE TIME OF INSPECTION OF ANY RENEWABLE ENERGY SYSTEM. A COVER INSPECTION IS REQUIRED BEFORE INSTALLATION BEGINS, BUT AFTER THE EQU | |
| 6612050-EL | 2017-08-07 | Electrical | 6242 31ST AVE NE | 8-25-17 BZ PV review waived per 2017 code new threshold 7.7KVA [A ONE-LINE DIAGRAM WILL BE REQUIRED ON SITE AT THE TIME OF INSPECTION OF ANY RENEWABLE ENERGY SYSTEM. A COVER INSP | |
| 6611804-EL | 2017-08-04 | Electrical | 4229 7TH AVE NE | [A ONE-LINE DIAGRAM WILL BE REQUIRED ON SITE AT THE TIME OF INSPECTION OF ANY RENEWABLE ENERGY SYSTEM. A COVER INSPECTION IS REQUIRED BEFORE INSTALLATION BEGINS, BUT AFTER THE EQU | |
| 6611412-EL | 2017-08-03 | Electrical | 324 NE 45TH ST | [A ONE-LINE DIAGRAM WILL BE REQUIRED ON SITE AT THE TIME OF INSPECTION OF ANY RENEWABLE ENERGY SYSTEM. A COVER INSPECTION IS REQUIRED BEFORE INSTALLATION BEGINS, BUT AFTER THE EQU | |
| 6611018-EL | 2017-08-01 | Electrical | 5326 KEYSTONE PL N | [A ONE-LINE DIAGRAM WILL BE REQUIRED ON SITE AT THE TIME OF INSPECTION OF ANY RENEWABLE ENERGY SYSTEM. A COVER INSPECTION IS REQUIRED BEFORE INSTALLATION BEGINS, BUT AFTER THE EQU | |
| 6609613-EL | 2017-07-25 | Electrical | 8116 14TH AVE SW | 7-27-17 BZ PV system one-line approved [A ONE-LINE DIAGRAM WILL BE REQUIRED ON SITE AT THE TIME OF INSPECTION OF ANY RENEWABLE ENERGY SYSTEM. A COVER INSPECTION IS REQUIRED BEFOR | |
| 6609774-EL | 2017-07-25 | Electrical | 222 FAIRVIEW AVE N | [A ONE-LINE DIAGRAM WILL BE REQUIRED ON SITE AT THE TIME OF INSPECTION OF ANY RENEWABLE ENERGY SYSTEM. A COVER INSPECTION IS REQUIRED BEFORE INSTALLATION BEGINS, BUT AFTER THE EQU | |
| 6602405-EL | 2017-06-13 | Electrical | 9021 49TH AVE NE | REPAIR/REPLACE METER ENCLOSURE | |
| 6600789-EL | 2017-06-05 | Electrical | 2730 BOYER AVE E | INSTALL 200A METER MAIN, TURN EXISTING 200A PANEL INTO SUBPANEL FED FROM NEW METER MAIN. | |
| 6600029-EL | 2017-05-31 | Electrical | 3937 SW 109TH ST | 6-13-17 BZ PV system one-line approved [A ONE-LINE DIAGRAM WILL BE REQUIRED ON SITE AT THE TIME OF INSPECTION OF ANY RENEWABLE ENERGY SYSTEM. A COVER INSPECTION IS REQUIRED BEFOR |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Seattle permit records through 2025, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →