COMPANY RECORD · CHICAGO, IL
Elgin Sheet Metal Co — permit history in Chicago, IL
Elgin Sheet Metal Co appears on 59 Chicago permit records from 2006 through 2025, all of them mechanical / hvac.
Permit categories
| Category | Permits | Share |
|---|---|---|
| Mechanical / HVAC | 65 | 100% |
Activity by year
| Year | Permits issued |
|---|---|
| 2006 | 4 |
| 2007 | 5 |
| 2008 | 10 |
| 2009 | 6 |
| 2012 | 1 |
| 2016 | 7 |
| 2017 | 2 |
| 2018 | 4 |
| 2019 | 4 |
| 2020 | 4 |
| 2021 | 5 |
| 2022 | 6 |
| 2023 | 2 |
| 2025 | 5 |
Busiest year on record: 2008, with 10 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| G.A. Johnson & Son | 23 | 2025-10-27 |
| Kern Konstruction, An Illinois Corporation | 10 | 2008-12-17 |
| Patrick Mac, Incorporated | 8 | 2009-12-22 |
| Smj Corporate LLC DBA Apex Design Build | 7 | 2025-02-11 |
| Synergy Construction Group | 7 | 2020-11-25 |
| Ebben Masonry Inc. | 5 | 2023-07-26 |
| Ed Fogarty Constr. Co., Inc | 4 | 2009-12-22 |
| Tk Concrete, Inc. | 3 | 2022-06-15 |
| Able Masonry Development | 2 | 2022-06-15 |
| Achilles, Inc. | 2 | 2021-06-23 |
| The Renovation Company, Inc. | 2 | 2016-07-21 |
| Scott General Contracting Company | 2 | 2008-02-04 |
27 companies are named alongside Elgin Sheet Metal Co on the same Chicago permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 150 W ROOSEVELT RD | 2025-10-27 |
| 4840 N PULASKI RD | 2025-07-16 |
| 30 W HURON ST | 2025-05-12 |
| 224 W HILL ST | 2025-02-11 |
| 706 E 47TH ST | 2023-11-16 |
| 3930 N KILPATRICK AVE | 2023-07-26 |
| 3030 S KEDZIE AVE | 2022-06-15 |
| 5941 S WESTERN AVE | 2022-06-15 |
| 5939 S WESTERN AVE | 2022-06-15 |
| 4030 W WRIGHTWOOD AVE | 2022-06-07 |
| 7800 S SOUTH CHICAGO AVE | 2022-03-08 |
| 7137 N WESTERN AVE | 2022-03-03 |
| 620 W 63RD ST | 2021-06-23 |
| 2333 E 95TH ST | 2021-06-17 |
52 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $1 to $2,474,310, median $420,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
59 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| 101072112 | 2025-10-27 | Mechanical / HVAC | 150 W ROOSEVELT RD | SELF CERT 2019 CBRC ALDI - SOUTH LOOP STORE NUMBER #098 INTERIOR RETROFIT OF EXISTING BUILDING 150 W. ROOSEVELT ROAD, CHICAGO, ILLINOIS 60605 | $2,000,000 |
| 101062156 | 2025-07-16 | Mechanical / HVAC | 4840 N PULASKI RD | SPR 2019 CBRC: REMODEL OF EXISTING RETAIL SPACE. WORK TO INCLUDE SELECTIVE DEMOLITION OF SECURITY GRILLES, SLIDING DOORS, CEILING, LIGHTING, COLUMN ENCLOSURES, POWER & DATA. CONSTR | $1,068,812 |
| 101065970 | 2025-05-12 | Mechanical / HVAC | 30 W HURON ST | SELF-CERT 2019 CBRC ALDI - RIVER NORTH - STORE #104 INTERIOR RETROFIT OF EXISTING BUILDING 30 W. HURON ST., CHICAGO, ILLINOIS 60654 | $1,600,000 |
| 101064548 | 2025-02-11 | Mechanical / HVAC | 224 W HILL ST | INTERIOR CONSTRUCTION OF NEW MEDICAL CLINIC BUSINESS OCCUPANCY WITH NO EXTERIOR ENVELOPE, STRUCTURAL OR OCCUPANCY CHANGES. | $1,915,102 |
| 101064449 | 2025-02-03 | Mechanical / HVAC | 224 W HILL ST | INTERIOR BUILD OUT OF COMMERCIAL OFFICE HEALTH CENTER (BUSINESS OCCUPANT) THAT INCLUDES NO STRUCTURAL WORK OR CHANGES TO THE BUILDING ENVELOPE OR OCCUPANCY. | $800,000 |
| 101032087 | 2023-11-16 | Mechanical / HVAC | 706 E 47TH ST | INTERIOR ALTERATIONS TO CONVERT EXISTING 1ST FLOOR COMMERCIAL SPACE OF EXISTING 2 STORY MIXED USE BUILDING TO MEDICAL SERVICE (DENTAL OFFICE), PER PLANS. | $2,474,310 |
| 101005539 | 2023-07-26 | Mechanical / HVAC | 3930 N KILPATRICK AVE | ***DIIRECT DEVELOPER SERVICES*** NEW CONSTRUCTION FOR A ONE-STORY MERCANTILE BUILDING. PILES ONLY PERMITTED UNDER #100987810. AS PER PLANS. | $1,000,000 |
| 100942875 | 2022-06-15 | Mechanical / HVAC | 3030 S KEDZIE AVE | SPR 2019 CBRC: INTERIOR & EXTERIOR ALTERATIONS TO EXISTING GROCERY STORE TO INCLUDE EXPANSION AT WEST ELEVATION, NEW ENTRANCE, NEW INTERIOR LAYOUT, NEW FREEZER AND COOLER AND CORRS | $1,700,000 |
| 100936158 | 2022-06-15 | Mechanical / HVAC | 5941 S WESTERN AVE | SPR 2019 CBRC: ALTERATIONS TO AN EXISITNG AUTO SERVICE CENTER TO REMODEL AND CONSTRUCT A NEW DEMISING PARTITION TO SEPERATE THE AUTO PARTS STORE FROM THE AUTO SERVICE CENTER PER PL | $150,000 |
| 100931294 | 2022-06-15 | Mechanical / HVAC | 5939 S WESTERN AVE | SPR 2019 CBRC: ALTERATIONS TO AN EXISITNG AUTO PARTS STORE TO REMODEL AND CONSTRUCT A NEW DEMISING PARTITION TO SEPERATE THE AUTO PARTS STORE FROM THE AUTO SERVICE CENTER PER PLANS | $150,000 |
| 100911171 | 2022-06-07 | Mechanical / HVAC | 4030 W WRIGHTWOOD AVE | SPR 2019 CBRC - ADDITION TO THE FRONT, LONG WALL OF AN EXISTING ALDI STORE. INTERIOR REMODEL OF SALES & ANCILLARY SPACES AS PER PLANS.**CERTIFIED CORRECTIONS SUBJECT TO FIELD INSPE | $750,000 |
| 100941792 | 2022-03-08 | Mechanical / HVAC | 7800 S SOUTH CHICAGO AVE | SPR 2019 CBRC: INTERIOR AND EXTERIOR ALTERATIONS TO EXISTING GROCERY STORE INCLUDING UPDATES TO MECHANICAL AND ELECTRICAL SYSTEMS, NEW FINISHES AND WALL MODIFICATIONS AND MODIFIED | $699,100 |
| 100936750 | 2022-03-03 | Mechanical / HVAC | 7137 N WESTERN AVE | SELF-CERT 2019 CBC: 1ST TIME TENANT BUILDOUT IN EXISTING 1-STORY MULTI-TENANT BUILDING WITH EXISTING DRIVE-THRU FOR NEW COFFEE RESTAURANT (STARBUCKS) TO INCLUDE EXTERIOR ALTERATION | $350,000 |
| 100907340 | 2021-06-23 | Mechanical / HVAC | 620 W 63RD ST | SPR 2019 CBRC: INTERIOR ALTERATIONS TO AN EXISTING ONE-STORY RETAIL GROCERY STORE TO INCLUDE NEW FINISHES, FIXTURES AND EQUIPMENT AND UPDATED ELECTRICAL, MECHANICAL AND PLUMBING SY | $1,000,000 |
| 100906438 | 2021-06-17 | Mechanical / HVAC | 2333 E 95TH ST | SPR 2019 CBRC: INTERIOR ALTERATIONS TO AN EXISTING ONE-STORY STEEL-FRAME GROCERY STORE BUILDING TO INLCUDE MODIFIED HVAC, PLUMBING AND ELECTRICAL SYSTEMS (OCCUPANCY M, TYPE IIB CON | $900,000 |
| 100926552 | 2021-06-11 | Mechanical / HVAC | 2600 N CLYBOURN AVE | REVISION TO PERMIT#100893544 CHANGE GC TO CAPITAL CONSTRUCTION SOLUTION, CHANGE HVAC TO ELGIN SHEET METAL CO. AND PLUMBING CONTRACTOR TO PROSPECTIVE PLUMBING CORP. | $1,000 |
| 100897893 | 2021-03-18 | Mechanical / HVAC | 5629 W FILLMORE ST | SPR 2019 CBRC: INTERIOR & EXTERIOR ALTERATIONS TO EXISTING GROCERY STORE TO INCLUDE NEW EXTERIOR CLADDING, INTERIOR FINISHES, NEW PARTITIONS, NEW HVAC SYSTEM WITH WALK IN COOLERS A | $950,000 |
| 100891833 | 2021-02-24 | Mechanical / HVAC | 1508 W 47TH ST | SPR 2019 CBRC: INTERIOR & EXTERIOR ALTERATIONS TO EXISTING GROCERY STORE TO INCLUDE NEW EXTERIOR CLADDING, INTERIOR FINISHES, NEW PARTITIONS, NEW HVAC SYSTEM WITH WALK IN COOLERS A | $832,700 |
| 100893647 | 2020-11-25 | Mechanical / HVAC | 6060 N MONITOR AVE | SPR 2019 CBRC: RENOVATION OF EXISTING SFR TO INCLUDE REMOVE EXISTING FRAME ADDITION AND REPLACE WITH NEW ADDITION. RENOVATE EXISTING KITCHEN. ALL WORK PER PLANS. (OCCUPANCY R-5, | $50,000 |
| 100893647 | 2020-11-25 | Mechanical / HVAC | 6060 N MONITOR AVE | SPR 2019 CBRC: RENOVATION OF EXISTING SFR TO INCLUDE REMOVE EXISTING FRAME ADDITION AND REPLACE WITH NEW ADDITION. RENOVATE EXISTING KITCHEN. ALL WORK PER PLANS. (OCCUPANCY R-5, | $50,000 |
| 100876754 | 2020-11-06 | Mechanical / HVAC | 6621 S COTTAGE GROVE AVE | INTERIOR AND EXTERIOR ALTERATIONS TO EXISTING GROCERY STORE TO INCLUDE NEW ADDITION AT THE NORTH ELEVATION, MODIFICATIONS TO THE ENTRANCE, NEW LIGHTING, NEW RTU'S AND PARTITIONS A | $1,305,475 |
| 100849488 | 2020-03-06 | Mechanical / HVAC | 201 W DIVISION ST | INTERIOR BUILDOUT AT FIRST FLOOR COMMERCIAL SPACE FOR A PROPOSED ALDI RETAIL STORE IN AN EXISTING BUILDING AS PER PLANS.**CERTIFIED CORRECTIONS- - SUBJECT TO FIELD INSPECTIONS & AU | $250,000 |
| 100786841 | 2019-06-26 | Mechanical / HVAC | 2038 N MILWAUKEE AVE | EXISTING CLASS C-2 SMALL ASSEMBLY. PROPOSED CLASS C-2 SMALL ASSEMBLY INTERIOR BUILD OUT FOR PERFORMANCE ARTS THEATER SMALL. OCCUPANCY PER PLANS **CERTIFIED PLANS CORRECTIONS: CONDI | $110,000 |
| 100792829 | 2019-03-25 | Mechanical / HVAC | 4934 S KEDZIE AVE | INTERIOR AND EXTERIOR RENOVATION/ALTERATION TO AN EXISTING ALDI ONE STORY BRICK BUILDING AS PER PLANS **CONDITIONAL PERMIT SUBJECT TO FIELD INSPECTIONS. | $1,000,000 |
| 100792753 | 2019-03-12 | Mechanical / HVAC | 2828 N CENTRAL AVE | INTERIOR & EXTERIOR RENOVATIONS/ALTERATIONS TO EXISTING ONE STORY BRICK ALDI GROCERY STORE AS PER PLANS **CERTIFIED PLANS CORRECTIONS: CONDITIONAL PERMIT SUBJECT TO FIELD INSPECTI | $1,500,000 |
| 100779279 | 2019-01-29 | Mechanical / HVAC | 1440 N KOSTNER AVE | ADDITION TO AN EXISTING ONE STORY BUILDING WITH INTERIOR ALTERATIONS AS PER PLANS | $150,000 |
| 100742468 | 2018-06-13 | Mechanical / HVAC | 3320 W BELMONT AVE | PD-127. ALTERATIONS TO AN EXISTING RETAIL SPACE, ALDI, AS PER PLANS. | $350,000 |
| 100723238 | 2018-06-05 | Mechanical / HVAC | 4500 N BROADWAY | B1-5. ADDITION TO EXISTING RETAIL STORE, ALDI, AS PER PLANS. **CERTIFIED PLANS CORRECTIONS: CONDITIONAL PERMIT SUBJECT TO FIELD INSPECTIONS ** | $300,000 |
| 100714877 | 2018-06-05 | Mechanical / HVAC | 8333 S CICERO AVE | ERECT 2,834 SF ONE STORY (CLASS F MERCANTILE) ADDITION TO EXISTING 16,300 SF ONE STORY (CLASS F MERCANTILE) GROCERY STORE, PER PLANS **CERTIFIED PLANS CORRECTIONS: CONDITIONAL PE | $1,200,000 |
| 100713321 | 2018-01-24 | Mechanical / HVAC | 6520 W FULLERTON AVE | PD-127. ALTERATIONS TO AN EXISTING RETAIL SPACE, ALDI, AS PER PLANS. **CERTIFIED PLAN CORRECTIONS PROJECT - CONDITIONAL PERMIT: SUBJECT TO FIELD INSPECTIONS ** | $700,000 |
| 100724898 | 2017-11-01 | Mechanical / HVAC | 30 N MICHIGAN AVE | INTERIOR REMODEL OF EXISTING DENTAL OFFICE SUITE 1506-1510 ON 15TH FLOOR WITHIN 21-STORY OFFICE BUILDING. WORK INCLUDES 1 NEW EXAM ROOM WITH SINK, REMODEL RECEPTION AREA, WAITING | $50,000 |
| 100660862 | 2017-04-03 | Mechanical / HVAC | 5501 S HARLEM AVE | ERECT NEW 18,914 SF ONE STORY CLASS F MERCANTILE GROCERY STORE AND ASSOCIATED PARKING LOT. | $2,000,000 |
| 100669801 | 2016-09-15 | Mechanical / HVAC | 2431 W MONTROSE AVE | REVISION TO PERMIT #100624575 TO CHANGE PLUMBING CONTRACTOR TO NORMAN MECHANICAL INC, VENT-HEAT CONTRACTOR TO ALGIN SHEET METAL COMPANY, | $1 |
| 100663989 | 2016-09-12 | Mechanical / HVAC | 1457 N HALSTED ST | SELF-CERTIFICATION: FIRST TIME INTERIOR BUILD OUT OF SUITE 301 TENANT AT 3RD FLOOR FOR MEDICAL SERVICES / DENTAL OFFICE IN EXISTING MULTI-STORY MIXED USE BUILDING. INCLUDES LAB, DI | $95,000 |
| 100642555 | 2016-07-21 | Mechanical / HVAC | 5819 N JERSEY AVE | SELF CERTIFICATION- NEW CONSTRUCTION 2 STORY WITH BASEMENT SINGLE FAMILY RESIDENCE WITH ATTACHED GARAGE AND REAR WOOD DECK. CONDITIONAL PERMIT SUBJECT TO FIELD INSPECTION. | $420,000 |
| 100642555 | 2016-07-21 | Mechanical / HVAC | 5819 N JERSEY AVE | SELF CERTIFICATION- NEW CONSTRUCTION 2 STORY WITH BASEMENT SINGLE FAMILY RESIDENCE WITH ATTACHED GARAGE AND REAR WOOD DECK. CONDITIONAL PERMIT SUBJECT TO FIELD INSPECTION. | $420,000 |
| 100645424 | 2016-05-26 | Mechanical / HVAC | 3637 N SOUTHPORT AVE | BRINGING BUILDING UP TO ADA STANDARDS, UPDATE OF PHOTOLAB MILLWORK, AND RESTROOM FIXTURE REPLACEMENT/RELOCATION. | $100,000 |
| 100643903 | 2016-04-28 | Mechanical / HVAC | 111 W WASHINGTON ST | SELF CERT; INTERIOR BUILD OUT OF SUITE 1350 ON THE 13TH FLOOR FOR A MEDICAL SERVICES / DENTAL OFFICE WITHIN EXISTING 22-STORY COMMERCIAL BUILDING. BUILD OUT INCLUDES WAITING ROOM, | $75,000 |
| 100643903 | 2016-04-28 | Mechanical / HVAC | 111 W WASHINGTON ST | SELF CERT; INTERIOR BUILD OUT OF SUITE 1350 ON THE 13TH FLOOR FOR A MEDICAL SERVICES / DENTAL OFFICE WITHIN EXISTING 22-STORY COMMERCIAL BUILDING. BUILD OUT INCLUDES WAITING ROOM, | $75,000 |
| 100467339 | 2012-11-15 | Mechanical / HVAC | 4627 W DIVERSEY AVE | REVISION TO PERMIT # 100439450 ISSUED 8/2/2012 TO CHANGE THE PLUMBER OF RECORD TO STOLTZEN & THE HVAC CONTRACTOR OF RECORD TO ELGIN SHEET METAL. | $1 |
| 100301506 | 2009-12-22 | Mechanical / HVAC | 3320 W BELMONT AVE | REVISION TO PERMIT FOR AUDITED SELF-CERT. PERMIT NO.100285507 INTERIOR BUILD-OUT OF ONE STORY RETAIL BUILDING TENANT SPACE | $800,000 |
| 100293499 | 2009-08-19 | Mechanical / HVAC | 1840 N CLYBOURN AVE | REVISION TO PERMIT FOR AUDITED SELF-CERT. PERMIT NO.100282896 EXISTING 4 STORY BUILDING INTERIOR TENANT BUILD-OUT ON GROUND FLOOR TENANT SPACE TO GROCERY STORE | $800,000 |
| 100285507 | 2009-06-17 | Mechanical / HVAC | 3320 W BELMONT AVE | INTERIOR BUILD-OUT OF ONE STORY RETAIL BUILDING TENANT SPACE | $800,000 |
| 100282896 | 2009-05-18 | Mechanical / HVAC | 1840 N CLYBOURN AVE | EXISTING 4 STORY BUILDING INTERIOR TENANT BUILD-OUT ON GROUND FLOOR TENANT SPACE TO GROCERY STORE | $800,000 |
| 100281564 | 2009-03-24 | Mechanical / HVAC | 6221 N BROADWAY | REVISION TO PERMIT #100274937 ALDI FOODS INTERIOR BUILD-OUT. 1073 SF OFFICE AREA UPGRADES. | $50,000 |
| 100274937 | 2009-02-09 | Mechanical / HVAC | 6221 N BROADWAY | GROUND FLOOR INTERIOR BUILD-OUT OF GROCERY STORE IN EXISTING 11 STORY BUILDING CODITIONAL PERMIT SUBJECT TO AUDIT | $700,000 |
| 100254615 | 2008-12-17 | Mechanical / HVAC | 835 N MICHIGAN AVE | INTERIOR ALTERATIONS OF EXISTING RESTAURANT SPACE, WITH NEW ARCHITECTURAL FINISHES, PLUMBING & ELECTRICAL FIXTURES AS PER PLANS. | $50,000 |
| 100254615 | 2008-12-17 | Mechanical / HVAC | 835 N MICHIGAN AVE | INTERIOR ALTERATIONS OF EXISTING RESTAURANT SPACE, WITH NEW ARCHITECTURAL FINISHES, PLUMBING & ELECTRICAL FIXTURES AS PER PLANS. | $50,000 |
| 100253993 | 2008-08-25 | Mechanical / HVAC | 3321 N MARSHFIELD AVE | REVISION TO PERMIT #100173337 TO CHANGE TO NEW VENT/HEAT CONTRACTOR 'ELGIN SHEET METAL CO.' S.A.E SUBJECT OT FIELD INSPECTION | $1 |
| 100236444 | 2008-07-18 | Mechanical / HVAC | 60 E GRAND AVE | REMODEL OF EXISTING OFFICE AND EMPLOYEE AREA TO EXISTING RESTAURANT | $25,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Chicago permit records through 2025, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
